問題一覧
1
cover the pipe with 50mm of overlay followed by 75mm of concrete paving
2
A hazard that cannot be eliminated, isolated or minimised
3
Bruising to a large area of the body
4
Replacing a noisy piece of machinery with a quieter model
5
Providing and wearing ppe to prevent injury
6
Creating a barricade around a piece of machinery to prevent workers coming into contact with the hazard
7
To recover plant and equipment from the site
8
Extra weight from soil or vehicles near the edge of the trench
9
To allow a drain to be laid within a neighbouring property
10
The drain must not be collapsed
11
Cesspit/Stormwater sump cleanings
12
Telecommunications
13
60m
14
The branch drain and junction receiving the waste from the gully dish should be removed and replaced with a straight section of pipe
15
150mm
16
3.0m
17
To stop the waste cooling and fats solidifying on the internal wall of the pipe
18
175mm
19
1:50 (2.0%)
20
9.60m
21
24 hours
22
500mm
23
A trench that is 1500mm deep and 1000mm wide
24
24 hours
25
1000mm
26
Drainlayer B
27
500mm
28
The person conducting a buissness undertaking (PCBU)
29
If an accident occurred, the code of practice is used as an example of good work practice and if not followed could indicate negligence
30
50 Years
31
The main pump should stop
32
A drain that serves 2 or more properties
33
500mm
34
5.1m^3
35
30 Minutes
36
19%
37
A preferred work practice guideline
38
An unplanned incident in the workplace that endangers the health and safety of workers
39
The company
40
3 months
41
10m^2
42
Eliminate all hazards from the employees workplace
43
Between 20% and Vertical
44
To prevent trap seal loss due to compression
45
10 years
46
1:350
47
180m^2
48
Junctions of drains serving a single downpipe that are less than 2.0m long
49
1.34m
50
0.9
51
10 m
52
Drip line irrigation system
53
1:80 or less
54
The sludge, scum and effluent separating while in a septic tank
55
12 Months
56
To supply oxygen to the bacteria within the tank
57
Worksafe NZ
58
The certifying drainlayer
59
When the drain is recieving no more than 18 fixture discharge units
60
The height difference between the inlet and outlet
61
Persons conducting buissness or undertaking
62
The company’s directors
63
24 months
64
When the notification is received by the board
65
Hydrogen sulphide
66
2.5m
67
An easement
68
2.0
Multichoice Tradesman Gas
Multichoice Tradesman Gas
ユーザ名非公開 · 74問 · 1年前Multichoice Tradesman Gas
Multichoice Tradesman Gas
74問 • 1年前Multichoice Certifying Gasfitting
Multichoice Certifying Gasfitting
ユーザ名非公開 · 66問 · 1年前Multichoice Certifying Gasfitting
Multichoice Certifying Gasfitting
66問 • 1年前問題一覧
1
cover the pipe with 50mm of overlay followed by 75mm of concrete paving
2
A hazard that cannot be eliminated, isolated or minimised
3
Bruising to a large area of the body
4
Replacing a noisy piece of machinery with a quieter model
5
Providing and wearing ppe to prevent injury
6
Creating a barricade around a piece of machinery to prevent workers coming into contact with the hazard
7
To recover plant and equipment from the site
8
Extra weight from soil or vehicles near the edge of the trench
9
To allow a drain to be laid within a neighbouring property
10
The drain must not be collapsed
11
Cesspit/Stormwater sump cleanings
12
Telecommunications
13
60m
14
The branch drain and junction receiving the waste from the gully dish should be removed and replaced with a straight section of pipe
15
150mm
16
3.0m
17
To stop the waste cooling and fats solidifying on the internal wall of the pipe
18
175mm
19
1:50 (2.0%)
20
9.60m
21
24 hours
22
500mm
23
A trench that is 1500mm deep and 1000mm wide
24
24 hours
25
1000mm
26
Drainlayer B
27
500mm
28
The person conducting a buissness undertaking (PCBU)
29
If an accident occurred, the code of practice is used as an example of good work practice and if not followed could indicate negligence
30
50 Years
31
The main pump should stop
32
A drain that serves 2 or more properties
33
500mm
34
5.1m^3
35
30 Minutes
36
19%
37
A preferred work practice guideline
38
An unplanned incident in the workplace that endangers the health and safety of workers
39
The company
40
3 months
41
10m^2
42
Eliminate all hazards from the employees workplace
43
Between 20% and Vertical
44
To prevent trap seal loss due to compression
45
10 years
46
1:350
47
180m^2
48
Junctions of drains serving a single downpipe that are less than 2.0m long
49
1.34m
50
0.9
51
10 m
52
Drip line irrigation system
53
1:80 or less
54
The sludge, scum and effluent separating while in a septic tank
55
12 Months
56
To supply oxygen to the bacteria within the tank
57
Worksafe NZ
58
The certifying drainlayer
59
When the drain is recieving no more than 18 fixture discharge units
60
The height difference between the inlet and outlet
61
Persons conducting buissness or undertaking
62
The company’s directors
63
24 months
64
When the notification is received by the board
65
Hydrogen sulphide
66
2.5m
67
An easement
68
2.0