問題一覧
1
Standard Forms in Project Implementation
D.O. 46 s 2022
2
Guidelines on Provisional Accreditation of DPWH Materials Engineer and Materials Inspector
D.O. 108 s 2018
3
Project and Contract Management Procedures and Application Policy Update
D.O. 15 s 2018
4
Accreditation of DPWH Materials Engineer
D.O. 12 s 2013
5
Standardization of Mterials Test Report
D.O. 177 s 1996
6
Guidelines on the Processing and Approval of “As-Staked” Plan
D.O. 15 s 2016
7
Revised Guidelines on the Accreditation and Assignment of DPWH Project Engineers and Inspectors
D.O. 115 s 2018
8
Standardization of Construction Duration of DPWH Projects
D.O. 44 s 2012
9
Amendment to D.O. 44 s 2012 Re: Shortened Standardized Construction Duration of DPWH Flood Control Projects
D.O. 71 s 2013
10
Clarification on the Limits of Authority of RDs and DEs in the Approval of Variation Orders and Construction Schedules (PERT-CPM/ PDM)
D.O. 45 s 2020
11
Implementation of Document Tracking System (DoTS) for Civil Works Projects
D.O. 11 s 2021
12
Standard Construction Duration for Critical Road Projects in National Capital Region (NCR) and Other Urban Areas
D.O. 141 s 2014
13
Testing and Acceptance of Construction Materials
D.O. 135 s 1993
14
Sampling and Testing of Construction Materials
D.O. 13 s 1987
15
Determination of Thickness of Concrete and Asphalt Pavement
D.O. 119 s 1992
16
Revised Criteria for Rating of Quality Assurance in Project Implementation
D.O. 102 s 2016
17
Standardization of Project Duration fir Standard DPWH School Building Projects
D.O.159 s 2015
18
Adoption of Precedence Diagram Method (PDM) as Project Scheduling Technique in DPWH Projects
D.O. 133 s 2015
19
Approval of Work Suspension Order, Work Resumption Order and Contract Time Extension for Civil Works Projects
D.O. 39 s 2024
20
Project Records
D.O. 216 s 2000
21
Standard Project Logbook Format
D.O. 50 s 2020