  • 1

    stairs can either be

    open,closed,supporting or supported

  • 2

    On a close stair layout is done on the

    Stairwell wall

  • 3

    Treads on exterior stairs should be slightly

    Sloped to allow for drainage

  • 4

    What is the perpendicular distance between throat and soffit lines?

    effective depth

  • 5

    Verify Blueprint measurements by taking

    A Field measurement

  • 6

    Stepping off, should be limited to

    Six risers

  • 7

    Reinforcing steel should be installed before

    Riser forms

  • 8

    The maximum vertical distance between landings is

    3700mm

  • 9

    The 7-Eleven rule is

    Unit rise times 11÷7

  • 10

    The maximum unit rise of a public stair

    180

  • 11

    The minimum tread depth for a public use stare

    280mm

  • 12

    Additional support for a residential precast stair is required when stairs is more than

    5 risers

  • 13

    When a mid height landing is installed the number of risers above and below the landing are

    equal

  • 14

    What is measurement from finished floor to finished floor below ?

    total rise

  • 15

    What surface is required for all public use stairs

    non slip

  • 16

    Riser should be bevelled at

    30-40 degrees

  • 17

    The concrete compartment that house is a stair is known as

    stairwell

  • 18

    The Layout rod must be long enough to extend from the

    nosing to bottom riser (nosing to nosing)

  • 19

    The minimum headroom for public use stairs

    2050mm

  • 20

    Stringers and cleats should be placed how far above the treads

    30mm

  • 21

    When pouring stairs, concrete placement should begin at

    The bottom of the stairs

  • 22

    What is the maximum unit run for public stairs?

    none

  • 23

    What is the private maximum run?

    355

  • 24

    What is your maximum nosing projection?

    25mm

  • 25

    What is the temporary structure installed to support concrete or Masonary construction?

    falsework

  • 26

    Measures must be taken at all construction sites to prevent anyone from being exposed to

    undue risk

  • 27

    A covered walkway is required when the construction activity is

    Less than 2 m from public walkway

  • 28

    Temporary work platforms require a guard rail when they are

    3 m above ground

  • 29

    The minimum time required to maintain a firewatch after welding is

    One hour

  • 30

    Excavations deeper than 1.5 m must be.

    Cut back or shored

  • 31

    An engineer must design all shoring for excavations of

    3 m or more

  • 32

    Solid barricades on the edge of fly forms are there to

    Prevent people from lookin and dropping tools

  • 33

    Underpinning provides what type of support

    Permanent support

  • 34

    What piece on a cable clamp is always installed on the dead end of the rope

    u bolt

  • 35

    What should be set up on working above rebar?

    fall protection

  • 36

    How far must you stay away from powerlines in heavy equpiment?

    7m

  • 37

    What signal means stop moving the load?

    swinging one arm to the side

  • 38

    outrigger pads must be

    suitable size and on solid ground

  • 39

    hand rail heights

    920-1070

  • 40

    slings should not have an angle more than?

    30 degrees

  • 41

    spoil piles must be at least how far from excavations?

    1m

  • 42

    using beams and columns to shore a structure before excavation is?

    needling

  • 43

    Any job site incident must be

    Reported to supervisor immediately

  • 44

    The horizontal distance between standards in each direction

    bay

  • 45

    The vertical distance between Transoms

    lift

  • 46

    Acts as a footing to distribute the load

    mudsill

  • 47

    The member that is there to support scaffold planks

    ledger

  • 48

    Guard rails are required on platforms at what height

    3m

  • 49

    Toe boards must be installed on all scaffold platform is more than

    3.5m above work or public area

  • 50

    The maximum height to width ratio of a freestanding scaffold is

    3:1

  • 51

    The maximum space of scaffold ties is (vertically)

    4.6

  • 52

    The maximum space for scaffold ties (horizontally)

    6.4

  • 53

    The maximum uniformly distributed load on the light duty scaffold is

    122kg

  • 54

    The maximum, uniformly distributed load on a heavy duty scaffold is

    122-367kg

  • 55

    The maximum plank span for a light duty scaffold is

    3m

  • 56

    The maximum plank span for a heavy duty scaffold is

    2.3m

  • 57

    How far should mudsills project be on the centre of the standard

    150-225mm

  • 58

    Bracket scaffolds can only be used as what type of scaffolds

    light duty

  • 59

    Ladder, jack scaffolds can not be more than?

    5m

  • 60

    When assembling frame scaffold on a slope, start the assembly, where

    high side

  • 61

    What is used with a tube and coupler scaffold to increase the capacity of a connection

    check clamp

  • 62

    What is considered a negative tie

    reveal tie

  • 63

    Scaffolds are designed with a factor of safety at

    4:1

  • 64

    What systems are used when it’s not practical to use frames?

    modular

  • 65

    When workers are travelling on a rolling scaffold, they cannot be higher than

    2x smaller base dimension

  • 66

    What must be installed at all times, when erecting or working from a swing stage?

    Fall arrest

  • 67

    How far must wood planks extend between Transoms?

    150-300