問題一覧
1
drainage
2
volume
3
horizontal control
4
breaking waves
5
steepness
6
Mean Lower Low Water
7
swells
8
capacity
9
warning signs
10
To delineate the edge of the travelled way to distinguish it from the shoulder area.
11
road capacity
12
DPWH
13
rectangular
14
road capacity
15
Spikes
16
all of the above
17
spring tides
18
Contours on the ground can cross another
19
98%
20
The point is reached at which speed declines noticeably
21
traffic signs
22
batching
23
decrease
24
significant wave
25
wind sea
26
pile
27
guide sign
28
all of these
29
D. delay
30
transverse cracks
31
Road topography
32
screeding
33
All of the above
34
age of tides
35
raveling
36
batching
37
slump test
38
specifications
39
hazard
40
wave
41
curing
42
Risk
43
combination of unusually high sea level with severe wave action
44
gravity waves
45
Density is more accurate: Only density is a function of cars in a given length of roadway
46
shrinkage
47
prime coat
48
2000 vph
49
mechanical, thermal, electrical and chemical
50
reliability
51
inner side of outer rail
52
maximum expected time
問題一覧
1
drainage
2
volume
3
horizontal control
4
breaking waves
5
steepness
6
Mean Lower Low Water
7
swells
8
capacity
9
warning signs
10
To delineate the edge of the travelled way to distinguish it from the shoulder area.
11
road capacity
12
DPWH
13
rectangular
14
road capacity
15
Spikes
16
all of the above
17
spring tides
18
Contours on the ground can cross another
19
98%
20
The point is reached at which speed declines noticeably
21
traffic signs
22
batching
23
decrease
24
significant wave
25
wind sea
26
pile
27
guide sign
28
all of these
29
D. delay
30
transverse cracks
31
Road topography
32
screeding
33
All of the above
34
age of tides
35
raveling
36
batching
37
slump test
38
specifications
39
hazard
40
wave
41
curing
42
Risk
43
combination of unusually high sea level with severe wave action
44
gravity waves
45
Density is more accurate: Only density is a function of cars in a given length of roadway
46
shrinkage
47
prime coat
48
2000 vph
49
mechanical, thermal, electrical and chemical
50
reliability
51
inner side of outer rail
52
maximum expected time