暗記メーカー
ログイン
PP - Pass4Succes
  • Peter Madsen

  • 問題数 83 • 12/2/2024

    記憶度

    完璧

    12

    覚えた

    31

    うろ覚え

    0

    苦手

    0

    未解答

    0

    アカウント登録して、解答結果を保存しよう

    問題一覧

  • 1

    Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

    Base unit of measure , Product type

  • 2

    Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?

    Batch management

  • 3

    Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.

    Resource selection , Resource network

  • 4

    Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.

    Use the Batch Information Cockpit. , Use the batch whereused list.

  • 5

    How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question. Digital signature

    Digital signature , Recipe approval , Batch record

  • 6

    Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

    Setup time , Total replenishment lead time

  • 7

    What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.

    You can reschedule the operation using finite scheduling in a planning table. , You can reschedule the operation in the Manage Work Center Capacity app.

  • 8

    Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

    Capacity requirements chart , Work center capacities chart

  • 9

    You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

    The new operation is inserted at the desired time; the previously dispatched operation is moved forward.

  • 10

    What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.

    Queue time , Setup time

  • 11

    What is a work center hierarchy?

    A group of alternative work centers for production structured in hierarchy levels by priorities

  • 12

    What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

    The Finite Scheduling indicator is NOT set in the strategy profile. , The work center has several individual capacities.

  • 13

    What information do you have to maintain to define the relationship between supply source dem source in the Kanban process? Note: There are 2 correct answers to this question.

    Replenishment strategy , Production supply area

  • 14

    Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

    Post the goods receipt for the finished product. , Reduce run schedule quantities. , Update statistics for the Business Information Warehouse.

  • 15

    How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition? Note: There are 3 correct answers to this question.

    Use run schedule quantities for inhouse production. , Use stock transfer reservations for stock transfer. , Use purchase orders for external procurement.

  • 16

    What does a line hierarchy in repetitive manufacturing represent?

    A production line with more than one work center

  • 17

    Which options do you have to plan both quantities capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

    Assign planned orders manually in the planning table. , Run MRP with automatic selection of production version.

  • 18

    What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

    Activating the reporting point backflush in the order dependent parameters the reporting point backflush in the work centers , Defining the operations as reporting points using the control key

  • 19

    Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.

    Production version , Routing

  • 20

    What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question.

    Change the assignments of production quantities to production lines. , Reschedule deallocate operations.

  • 21

    Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.

    Customers can grant access to the dashboard to partners. , It can be accessed by using SAP For Me.

  • 22

    What are some SAP recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question.

    Establish regular housekeeping tasks procedures. , Integrate clean core practices in the endtoend value process chain. , Establish release management.

  • 23

    You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve maintain clean core data quality? Note: There are 2 correct answers to this question

    Accuracy, Timeliness

  • 24

    You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles. Which of the following SAP Signavio solutions can be used for the remodeling?

    SAP Signavio Process Manager

  • 25

    You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past. How can you parameterize this in the strategy profile?

    Specify a negative offset time.

  • 26

    Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

    When alternative resources are used within one operation

  • 27

    How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

    Determine a time period with available capacity on the planning board. , Increase the capacity supply in a timephased interval. , Form optimum sequences to reduce setup times.

  • 28

    Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

    Use a resource group.

  • 29

    What can you use stard heuristics in Advanced Planning (PP/DS) for?

    To solve planning problems for defined objects , To optimize costs times in production plans

  • 30

    How would you define pegging in the context of Advanced Planning?

    An evaluation that is ordered according to the bill of material structure of all related products represents the relationship between the receipt the issue elements

  • 31

    Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

    Assign the alert profile to the overall profile. , Create an object selection variant for productionplanningrelated alerts.

  • 32

    What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation? Note: There are 2 correct answers to this question.

    Scheduling of an operation takes place as close as possible to the desired date. , Neighboring operations can be moved in both directions in order to create a slot.

  • 33

    Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

    Work center , Material

  • 34

    What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

    Planned order , Scheduling agreement schedule line

  • 35

    Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question.

    Changing the procurement type in the product master , Changing the stock in inventory management

  • 36

    Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.

    To save multiple changes for an object , To monitor document object changes

  • 37

    You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero the discontinuation date is in the past?

    Material requirements planning

  • 38

    What are the key features of using a low level code? Note: There are 2 correct answers to this question.

    To determine how costs are rolled up by product costing , To determine the sequence in which materials are planned in MRP

  • 39

    Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

    To simplify the structure of bills of material , To reduce the number of changes required in bills of material , To make the assignment of components easier

  • 40

    Which stard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

    Variablesize item , Preliminary item

  • 41

    What does the material type influence? Note: There are 2 correct answers to this question.

    Which material master screens appear in which sequence , Whether the material is produced inhouse procured externally or both

  • 42

    What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.

    Manufacturing date , Lot size

  • 43

    Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

    Base unit of measure , Product type

  • 44

    What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.

    Quantity , Installation point

  • 45

    Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

    Simultaneous , Manual maintenance

  • 46

    Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

    Wait time , Processing time , Setup time

  • 47

    Under what circumstances can you change the material type for a material if stocks reservations or purchasing documents exist? Note: There are 2 correct answers to this question.

    The quantity value updates are the same. , The same account category is used.

  • 48

    How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

    Select a special procurement type inside the material master. , Define the special procurement type inside the material BOM (bill of material).

  • 49

    Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.

    Is the material type allowed in the BOM? , What status does the BOM have?

  • 50

    What is the difference between coproducts byproducts?Note: There are 2 correct answers to this question.

    Only coproducts have movement type 101. , Only coproducts appear in the process or production order settlement rule.

  • 51

    How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

    By plant , By period

  • 52

    Your project team decides to use a maketoorder planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision? Note: There are 3 correct answers to this question.

    Net requirements calculation is carried out for every sales order individually. , Production orders are created with sales order reference. , Sales orders have to be ATPconfirmed (availabletopromise) to be saved.

  • 53

    You want to set up a maketoorder planning scenario for a finished product. The bill of material contains two components: one should be procured for eac sales order individually the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

    Choose planning strategy 20 (MaketoOrder) select the corresponding Individual/Collective indicator.

  • 54

    You want to trigger inhouse production of a semifinished material before a sales order for the corresponding finished good is received.Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semifinished material?

    Planning at assembly level (70)

  • 55

    Your company produces a finished good based on a forecast expects it to be in stock when customers order it. If customers order more than the forecasted quantity this must NOT have any impact on the production program. Which planning strategy do you use?

    Make to stock production (10)

  • 56

    What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.

    Option to forecast planning for production resources , Option to use maketoorder production

  • 57

    You want to reduce planning efforts for B C classified materials. Which planning procedure do you recommend?

    Consumption Based Planning

  • 58

    Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

    Work center , Routing

  • 59

    What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

    A sales order is created.

  • 60

    What are the advantages of collective orders? Note: There are 2 correct answers to this question.

    To perform availability checks across the entire collective order , To post confirmations for the entire collective order

  • 61

    You are trying to create a production order NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

    The order lot size is NOT within the validity range of a production version. , All production versions for the material are locked.

  • 62

    What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

    A sales order is created.

  • 63

    What are the advantages of collective orders? Note: There are 2 correct answers to this question.

    What are the advantages of collective orders? Note: There are 2 correct answers to this question., To post confirmations for the entire collective order

  • 64

    You are trying to create a production order NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

    The order lot size is NOT within the validity range of a production version. , All production versions for the material are locked.

  • 65

    You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question.

    Create without material , Create in Kanban process

  • 66

    Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

    You can use trigger points to automatically create rework orders via confirmations. , You can use mass processing to set production orders to technically complete.

  • 67

    For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question.

    In productrelated COC all costs are debited credited to a product cost collector. , Orderrelated COC is beneficial in a flexible production environment.

  • 68

    Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.

    Select master data. , Define integration with cost accounting.

  • 69

    You want to use capacity availability checks for production orders. Which settings have to be made for this? Note: There are 2 correct answers to this question.

    The Relevant for Finite Scheduling indicator must be set. , An overall profile must be assigned in the checking control.

  • 70

    For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

    The deletion flag must NOT be set for the bill of material (BOM) or the routing. , The assigned routing bill of material (BOM) must be valid in the entire validity period. , The lot size range must be within the lot size range of the assigned routing.

  • 71

    How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

    By order release , By mass processing

  • 72

    During production order creation several valid production versions are found. How does the system choose the production version?

    Alphanumeric or quota arrangement

  • 73

    Where does the system check master data selection settings during the creation of planned orders production orders? Note: There are 3 correct answers to this question.

    In the production version , In the bill of material (BOM) , In the routing

  • 74

    What will happen in the MRP run if you have created a new MRPrelevant material that supports both inhouse production external procurement?

    The MRP run assumes inhouse production.

  • 75

    Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.

    Integrated Business Planning (IBP) , Supply Chain Management (SCM)

  • 76

    What does forecasting in the dem planning cycle include? Note: There are 3 correct answers to this question.

    Oneoff events , Market intelligence , Past sales order quantities

  • 77

    What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.

    Requirements type , Planning strategy

  • 78

    Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question.

    Planned delivery time , Inhouse production time

  • 79

    How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.

    They are created on assembly level during the planning run. , They are created with exact times in Advanced Planning.

  • 80

    Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.

    Procurement type , MRP type

  • 81

    In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

    MRP creates the capacity requirements without considering existing load on the work centers.

  • 82

    In your plant MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.

    Use a specific material status. , Use a specific MRP type.

  • 83

    Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

    Production orders , Planned orders (firmed)