EE OBJS
問題一覧
1
Increase the working voltage
2
Punctured
3
Universal
4
500
5
Standby plant
6
3
7
To ensure that distribution system will be operated by only one distribution company
8
When length of a conductor increased
9
Shunt
10
Thickness of armature lamination
11
reverse power relay
12
3
13
Circuit breaker
14
Nature of material
15
1800 mm
16
125% motor FL current plus other current
17
Peak
18
2000
19
Graphite
20
Yellow alert
21
Red alert
22
Security alert
23
Weather disturbance alert
24
critical loading
25
Medium voltage
26
90%
27
59.7 Hz & 60.3 Hz
28
Spinning reserve
29
Hot standby reserve
30
Back up reserve
31
Cold standby reserve
32
contingency reserve
33
Decrease
34
Proportional to the square of the voltage
35
Low melting point and high specific resistance
36
Oil immersed transformer against all internal faults
37
Delta - Delta connection
38
Near the transformer
39
Ring system
40
Cold reserve
41
Compensate for line inductive reactance
42
Impulse voltage
43
Impedance relays
44
Generators
45
Charging carbon exists
46
Feeder
47
SF6 circuit breaker
48
Increase
49
shunt capacitor
50
earth wire
51
transmission line
52
at the top of the building
53
to drip out the rainwater and to increase the possible conducting length of the path
54
decreasing
55
To improve the power factor and voltage magnitude
56
outdoor type
57
all of the above
58
Both A & B
59
Steam power plant
60
Diesel power plant
61
Reciprocal of A
62
0.75 and 1.0
63
resistance of finite value
64
intermediate points
65
capacitance
66
insulators
67
surface of the conductor
68
attenuation constant
69
wl^2/ 2T
70
both A and B
71
Latticed steel poles
72
increase of 20%
73
distributed parameters of R, L, C and G
74
C.balance the three phases of the circuit
75
the current in other conductor
76
load flow
77
both A and B
78
either A or B
79
C. more than that at the sending end
80
all of the above
81
nearly equal unity
82
all of the above
83
radio interference
84
both A and B
85
all of the above
86
synchrounous reactance
87
all of these
88
L G L L L L G L L L G
89
complex conjugate of positive sequence component"
90
either A or B
91
1.0
92
sending and other end
93
C. both A and B
94
power output
95
hydro power station
96
nuclear
97
HV side
98
increases
99
diesel power station
100
2 poles
ESAS 2.0
ESAS 2.0
Almeda, Abegail S. · 99問 · 2年前ESAS 2.0
ESAS 2.0
99問 • 2年前Engineering Economy
Engineering Economy
Almeda, Abegail S. · 71問 · 2年前Engineering Economy
Engineering Economy
71問 • 2年前Thermodynamics
Thermodynamics
Almeda, Abegail S. · 99問 · 2年前Thermodynamics
Thermodynamics
99問 • 2年前PEC
PEC
Almeda, Abegail S. · 88問 · 2年前PEC
PEC
88問 • 2年前ESAS OBJS
ESAS OBJS
Almeda, Abegail S. · 100問 · 1年前ESAS OBJS
ESAS OBJS
100問 • 1年前ESAS OBJS
ESAS OBJS
Almeda, Abegail S. · 74問 · 1年前ESAS OBJS
ESAS OBJS
74問 • 1年前EE
EE
Almeda, Abegail S. · 99問 · 1年前EE
EE
99問 • 1年前EE
EE
Almeda, Abegail S. · 65問 · 1年前EE
EE
65問 • 1年前問題一覧
1
Increase the working voltage
2
Punctured
3
Universal
4
500
5
Standby plant
6
3
7
To ensure that distribution system will be operated by only one distribution company
8
When length of a conductor increased
9
Shunt
10
Thickness of armature lamination
11
reverse power relay
12
3
13
Circuit breaker
14
Nature of material
15
1800 mm
16
125% motor FL current plus other current
17
Peak
18
2000
19
Graphite
20
Yellow alert
21
Red alert
22
Security alert
23
Weather disturbance alert
24
critical loading
25
Medium voltage
26
90%
27
59.7 Hz & 60.3 Hz
28
Spinning reserve
29
Hot standby reserve
30
Back up reserve
31
Cold standby reserve
32
contingency reserve
33
Decrease
34
Proportional to the square of the voltage
35
Low melting point and high specific resistance
36
Oil immersed transformer against all internal faults
37
Delta - Delta connection
38
Near the transformer
39
Ring system
40
Cold reserve
41
Compensate for line inductive reactance
42
Impulse voltage
43
Impedance relays
44
Generators
45
Charging carbon exists
46
Feeder
47
SF6 circuit breaker
48
Increase
49
shunt capacitor
50
earth wire
51
transmission line
52
at the top of the building
53
to drip out the rainwater and to increase the possible conducting length of the path
54
decreasing
55
To improve the power factor and voltage magnitude
56
outdoor type
57
all of the above
58
Both A & B
59
Steam power plant
60
Diesel power plant
61
Reciprocal of A
62
0.75 and 1.0
63
resistance of finite value
64
intermediate points
65
capacitance
66
insulators
67
surface of the conductor
68
attenuation constant
69
wl^2/ 2T
70
both A and B
71
Latticed steel poles
72
increase of 20%
73
distributed parameters of R, L, C and G
74
C.balance the three phases of the circuit
75
the current in other conductor
76
load flow
77
both A and B
78
either A or B
79
C. more than that at the sending end
80
all of the above
81
nearly equal unity
82
all of the above
83
radio interference
84
both A and B
85
all of the above
86
synchrounous reactance
87
all of these
88
L G L L L L G L L L G
89
complex conjugate of positive sequence component"
90
either A or B
91
1.0
92
sending and other end
93
C. both A and B
94
power output
95
hydro power station
96
nuclear
97
HV side
98
increases
99
diesel power station
100
2 poles