問題一覧
1
Signs that inform road users about the direction and distances of destinations on the route they are following or along other roads that intersect their route.
Guide Signs
2
A measure of materials ability to resist indentation or penetration.
Hardness
3
The process of injecting any agent into soil or rock to increase its strength or stability, protect foundations or reduce ground water.
Grouting
4
Operating a motor vehicle on a street or highway can be complex and demanding at times, but it can be boring at other times. these range of circumstances coupled with the range of driver capabilities presents a challenge to the highway designer. it is helpful to begin by considering the three essential elements such as navigation, guidance and control is referred to as:
Driving Task
5
Which of the following reasons will not cause a contract change?
Unforseen Conditions
6
If you are preparing a report on PERT CPM network in a construction job, what time scheduling should you consider in the preparation of the PERT CPM network diagram?
All of the Above
7
This drawing has elevation as its vertical axis and horizontal distance as measured along the center line of the facility (or other reference line), as its horizontal axis.
profile
8
The berth structure projecting out from the shoreline
Pier
9
Every construction project shall have a suitable ___ which must be in accordance with these rules, and other orders and issuances issued by the DOLE
Construction Safety and Health Program
10
It provides the detailed requirements for the materials, equipment, and workmanship to be incorporated into the project
Specifications
11
A formal or legally binding agreement between two parties is referred to as :
contract
12
Signs used to guide drivers through a change in horizontal alignment of the Road
Chevron Signs
13
If the standard deviation of a set of observations is zero, you can conclude:
That all observations are the same value
14
It occurs after the completion of construction, and the resolution of the majority of punch list and comissioning issues
profile
15
What are the capacity requirement for all scaffoldings?
Atleast 4 times its own weight
16
The bucket volume contained within the bucket when following the outline of the bucket sides is referred to as:
Plate Line Capacity
17
Because concrete is unable to maintain a particular shape before it sets. It must be placed in a form or mold. In building construction, this is called
formwork
18
A method of protecting employees from cave-ins from material that could fall or roll from an excavation face or into an excavation or collapse of adjacent structures. This includes support systems, sloping and benching systems, shield systems and other systems that provide the necessary protection.
Protective System
19
What is the reaction time to be used for the road safety design? This value is applied to the whole range of design speeds
2.5 seconds
20
An increase in soil density of a cohesive soil resulting from the expulsion of water from the soil's void spaces
Consolidation
21
It is an informal group discussion that focuses on a particular safety issue. These can be used daily to promote department safety culture as well as to facilitate health and safety discussions on job sites is known as:
toolbox meeting
22
It is a measure of a material's ability to dissipate or deaden mechanical vibrations.
damping capacity
23
a method of protecting workers from cave-ins by excavating the sides of an excavation to form one or a series of horizontal level or steps, usually with a vertical near vertical surfaces between levels
benching
24
The basic lane width appropriate for national road
3.35m