  • 1

    What is the purpose of collective order?

    To manage production for an entire finshed produt on multiple levels

  • 2

    You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can You Parameterize this strategy profile?

    Specify a negative offset time.

  • 3

    Your production planners must execute planning only for specific resources How can you achieve thisin Advaced Planning [PP/DS]?

    Use a resourece group.

  • 4

    Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

    You can use trigger points th qutomaticlly cteate rework orders via confirmations., You can use mass processing to set production orders to technically complet.

  • 5

    How can you set up the supply source for the kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question.

    Use purchase orders for external procurement., Use stock transfer reservation for stock transfer., Use run schedule quantities for in-house production

  • 6

    You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must your do? Note: There are 2 correct answers to this question.

    Add the agreeent to the sourece list and mark it for MRP relevance., Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

  • 7

    How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

    increase the capacity supply in a time-ph ased interval., Form optimum sequences to reduce setup times., Determine a time period with available on the plannin board.

  • 8

    What will happen in the MRP run if you have created a new MRP-relevnt material that supports both in-house production and external procurement?

    The MRP run assumes external procurement.

  • 9

    Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question

    In the routing, In the bill of material (BOM) , In the production version

  • 10

    What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.

    Reduced delivery times, Reduced production times

  • 11

    What can you use heuristics in Advanced Planning (PP/PS) for?

    To solve planning problems for defined objects

  • 12

    For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

    The assigned routing must NOT have alternative sequences., The assigned routing and bill of material (BOM) must he valid in the entire validity period., The deletion flag must NOT be set for the bill of material (BOM) or the routing.

  • 13

    Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.

    Wait time, Move time, Queue time

  • 14

    You want to insert an operation at a certain time on a work center in the graphical planning table. The manning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

    The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

  • 15

    What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

    To determine the work in progress along the production line, To provide timely updates of inventory management for the staged components

  • 16

    In your plant, MRP is activated. Which options do you have to exclude a material from the MEW run? Note: There are 2 correct answers to this question.

    Use a specific material status., Use a specific MRP type.

  • 17

    What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

    Past sales order quantities, Market intelligence, One-off events

  • 18

    What is a work center hierarchy in capacity planning?

    A group of alternative work centers providing a cumulative available capacity for production

  • 19

    Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

    Forecast key figures, Safety stock

  • 20

    Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

    Create an object selection variant for production-planning-related alerts., Assign the alert profile to the overall profile.

  • 21

    Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

    Work center, Material

  • 22

    What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

    The Finite Scheduling indicator is NOT set in the strategy profile., The work center has several individual capacities.

  • 23

    When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly)?

    When you create a sales order

  • 24

    Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Mote: There are 3 correct answers to this question.

    Posting of goods receipt for the product, Reduction of associated capacity requirements, Posting of production costs to the production cost collector

  • 25

    In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

    MRP creates the capacity requirements without checking the work center capacities.

  • 26

    You want to use capacity availability checks for production orders. Which settings have to be made for this? Note: There are 2 correct answers to this question.

    An overall profile must be assigned in the checking control., The Relevant for Finite Scheduling indicator must be set.

  • 27

    Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics?

    Batch management

  • 28

    Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.

    Supply Chain Management (SCM), Integrated Business Planning (IBP)

  • 29

    Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

    Run MRP with quota arrangement., Run PP/DS heuristics for repetitive manufacturing.

  • 30

    If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

    Fill up based on the lot size procedure.

  • 31

    Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA? Note: There are 2 correct answers to this question.

    Manual maintenance, 100% check

  • 32

    Which master data object governs the relationship between supply source and demand source in the Kanban process?

    Control cycle

  • 33

    You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question.

    Create without material, Create in Kanban process

  • 34

    How would you define pegging in the context of Advanced Planning?

    An evaluation that is ordered according to the bill-of-material structure ohm related products and represents the relationship between the receipt and the issue elements

  • 35

    You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

    Planning at assembly level (70)

  • 36

    How can you characterize dependent requirements in material requirements planning? Note: There are 2 correct answers to this question.

    They are created when an independent requirement is created for the finished product., They are created on assembly level during the planning run.

  • 37

    What do you need to consider when working with material master numbering in SAP S/4HANA? Note: There are 2 correct answers to this question.

    The maximum material number length is 40 for external numbers and 18 for internal numbers., Material numbering is defined at client level.

  • 38

    You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 3 correct answers to this question.

    Model a goods receipt time in the material master., Model a transportation lane and carrier selection in the location master., Model a handling resource in the location master.

  • 39

    Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

    Non-stock item, Variable-size item

  • 40

    Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.

    Planned delivery time , In-house production time

  • 41

    What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

    Scheduling agreement schedule line, Planned order

  • 42

    Why would you use phantom assemblies? Note: There are 3 correct answers to this question

    To make the assignment of components easier, To reduce the number of changes required in bills of material, To simplify the structure of hills of material

  • 43

    You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

    Material requirements planning

  • 44

    Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question.

    Co-products, Waste products, By-products

  • 45

    Mode selection is one of the scheduling options available with Advanced Planning in SAP S4/HANA. When can you use mode selection?

    When alternative resources are used within one operation

  • 46

    Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.

    What status does the BOM have?, Is the material type allowed in the BOM?

  • 47

    Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?

    Planning with final assembly (40)

  • 48

    Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

    Routing, Work center

  • 49

    What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.

    Installation point , quantity

  • 50

    During production order creation, several valid production versions are found. How does the system choose the production version?

    Validity period or sales order

  • 51

    Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

    Changing the stock in inventory management, Changing the procurement type in the product master, Changing the purchasing contract in materials management

  • 52

    You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

    The order lot size is NOT within the validity range of a production version., All production versions for the material are locked.

  • 53

    What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.

    Lot size, Manufacturing date

  • 54

    How can you limit the validity of a bill of material (BOlD7 Note: There are 2 correct answers to this question.

    By plant, By period

  • 55

    Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

    Production orders are created with sales order reference., Sales orders have to be ATP-confirmed (available-to-promise) to be saved., Net requirements calculation is carried out for every sales order individually.

  • 56

    Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question.

    Product type, Base unit of measure

  • 57

    You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?

    Consumption-Based Planning

  • 58

    Where do you maintain the work center that represents the production line for repetitive manufacturing? There are 2 correct answers to this question.

    Production version, Routing

  • 59

    What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.

    Queue time, Move time

  • 60

    Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.

    Procurement type, Material type

  • 61

    What does the material type influence? Note: There are 2 correct answers to this question.

    Which document types and class categories are allowed, Which material master screens appear and in which sequence

  • 62

    What does a line hierarchy in repetitive manufacturing represent?

    A production line with more than one work center

  • 63

    Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

    Capacity requirements chart, Work center capacities chart

  • 64

    Which business processes are affected by settings in the order-type-dependent parameters? Note: There are 2 correct answers to this question.

    Define integration with cost accounting., Select master data.

  • 65

    How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question.

    Approved resources, Batch record, Digital signature

  • 66

    What is the difference between co-products and by-products?

    Only co-products appear in the process or production order settlement rule.

  • 67

    Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.

    Use the batch where-used list., Use the Batch Information Cockpit.

  • 68

    You want to set up a make-to-order planning scenario for a finished material. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

    C. Choose planning strategy 50(Planning without final assembly) and select the corresponding Individual/Collective indicator.

  • 69

    What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.

    You can reschedule the operation using finite scheduling in a planning table., You can reschedule the operation using lead time scheduling in a planning table.

  • 70

    How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

    Change the phantom item indicator for the phantom assembly in the bill of material (BOM). , Define the special procurement type inside the material master.

  • 71

    What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

    Requirements type, Planning strategy

  • 72

    What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

    The planned order generates capacity requirements.

  • 73

    Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

    Resource network, Resource hierarchy

  • 74

    For production orders, cost object controlling (COC) can be carried out on an order-related or product-related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question.

    Order-related COC is beneficial in a flexible production environment., In product-related COC, all costs are debited and credited to a product cost collector.

  • 75

    Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

    Pick/pack time, Setup time, Move time

  • 76

    How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

    By order release, By mass processing

  • 77

    You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

    Find slot

  • 78

    Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

    Setup time, Float after production

  • 79

    In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

    Planning mode, Direction, Scheduling control

  • 80

    Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

    The quantity and value updates are the same., The same account category is used.