問題一覧
1
To give the time for the protection to kick in before any other operation can be done.
2
Correct S/S, Correct switch name, Current switch position is as per skedule, Check switch condition, Check earth, Check local supplies are as expected
3
F1H, F2V, Green triangle
4
Fault rated/Cat2 Fitted with any type of arcing horns or plain break contacts/V for vertically mounted.
5
Vertical = 50% less current breaking capacity than horizontal.
6
No markings means treat as Cat3 - DEAD OP ONLY.
7
1 Keep proper record of all messages passed by telephone or otherwise relating to the operation of the high voltage systems. 2 Read back to the sender of every such message relating to the operation of high voltage systems, ensuring accuracy. 3 Carry out operations instructed by the control engineer without unnecessary delay, then the implementation of the instructions shall be reported back to the control engineer as soon as possible.
8
To lock off the circuit being worked on, to prevent it from being energised until ready to be restored.
9
They shall be removed and kept in a safe place, commonly with the person issuing the safety document.
10
1 A circuit breaker for first leg work 2 A rated earth switch 3 Portable earth's.
11
Use an approved voltage testing device to verify that the circuit is dead - Connect the earth leads to the earth end first - Connect earths to all phase conductors
12
An authorised person or a competent person acting under the personal supervision of an AP
13
The system controller
14
The system controller
15
The operation of any device that makes or breaks a circuit including the application/removal of CMEs
16
The shutters must be locked shut and the keys accessible only to an AP
17
The system controller
18
In an emergency
19
No
20
It must be carried out without undue.Delay and reported back to the system controller as soon as possible
21
No switching to take place and the system controller informed of the condition of the switchgear
22
Helmet-EyeProtection-FlashJacket-RubberGloves-Yellowinsulatedwellies
23
No
24
No
25
They should be fitted so that they do not need to be removed until the circuit is being restored to service
26
2440mm/8ft/2rods or double that max
27
In order to prove the integrity of the secondary isolating contacts between the fixed portion and the moving portion of the circuit breaker.
28
Telly control - Local trip handle - Manual operation
29
The holder of the Items/Schedule/ Person operating the switch
30
None and report back to control
31
The system controller
32
Lock them in a key safe or preferably give them to the SAP in charge of the works
33
Independent manual
34
No
35
Yes
36
A safety lock + Caution notice
37
Earthing Switch, Interlock, Test access, Transformer tap changer, VT chamber
38
Weather shield
39
On/Off switch
40
Stop - Ask the customer to leave the SS - Confirm right switch and right operation - Operate and record - Talk to the customer.
41
get ans
42
Right switch, Right position, Check earthing condition, Check condition of permaly
43
Fault level in excess of making capability
44
Fault level less than making capability.
45
Remotely via remote control facilities - Remotely onsite via control panels in a different room as the switch gear being operated - Remotely via a control panel in the same room as the switchgear being operated - Remotely via an approved umbilical device or similar - Via the operating facilities on the switch game
46
Outside the building
47
No
48
The ABSD are not able to break fault current
問題一覧
1
To give the time for the protection to kick in before any other operation can be done.
2
Correct S/S, Correct switch name, Current switch position is as per skedule, Check switch condition, Check earth, Check local supplies are as expected
3
F1H, F2V, Green triangle
4
Fault rated/Cat2 Fitted with any type of arcing horns or plain break contacts/V for vertically mounted.
5
Vertical = 50% less current breaking capacity than horizontal.
6
No markings means treat as Cat3 - DEAD OP ONLY.
7
1 Keep proper record of all messages passed by telephone or otherwise relating to the operation of the high voltage systems. 2 Read back to the sender of every such message relating to the operation of high voltage systems, ensuring accuracy. 3 Carry out operations instructed by the control engineer without unnecessary delay, then the implementation of the instructions shall be reported back to the control engineer as soon as possible.
8
To lock off the circuit being worked on, to prevent it from being energised until ready to be restored.
9
They shall be removed and kept in a safe place, commonly with the person issuing the safety document.
10
1 A circuit breaker for first leg work 2 A rated earth switch 3 Portable earth's.
11
Use an approved voltage testing device to verify that the circuit is dead - Connect the earth leads to the earth end first - Connect earths to all phase conductors
12
An authorised person or a competent person acting under the personal supervision of an AP
13
The system controller
14
The system controller
15
The operation of any device that makes or breaks a circuit including the application/removal of CMEs
16
The shutters must be locked shut and the keys accessible only to an AP
17
The system controller
18
In an emergency
19
No
20
It must be carried out without undue.Delay and reported back to the system controller as soon as possible
21
No switching to take place and the system controller informed of the condition of the switchgear
22
Helmet-EyeProtection-FlashJacket-RubberGloves-Yellowinsulatedwellies
23
No
24
No
25
They should be fitted so that they do not need to be removed until the circuit is being restored to service
26
2440mm/8ft/2rods or double that max
27
In order to prove the integrity of the secondary isolating contacts between the fixed portion and the moving portion of the circuit breaker.
28
Telly control - Local trip handle - Manual operation
29
The holder of the Items/Schedule/ Person operating the switch
30
None and report back to control
31
The system controller
32
Lock them in a key safe or preferably give them to the SAP in charge of the works
33
Independent manual
34
No
35
Yes
36
A safety lock + Caution notice
37
Earthing Switch, Interlock, Test access, Transformer tap changer, VT chamber
38
Weather shield
39
On/Off switch
40
Stop - Ask the customer to leave the SS - Confirm right switch and right operation - Operate and record - Talk to the customer.
41
get ans
42
Right switch, Right position, Check earthing condition, Check condition of permaly
43
Fault level in excess of making capability
44
Fault level less than making capability.
45
Remotely via remote control facilities - Remotely onsite via control panels in a different room as the switch gear being operated - Remotely via a control panel in the same room as the switchgear being operated - Remotely via an approved umbilical device or similar - Via the operating facilities on the switch game
46
Outside the building
47
No
48
The ABSD are not able to break fault current