問題一覧
1
The Butler USAF BA-30 Low Profile Parachute (LPP) Emergency Parachute system is a _____style parachute designed for aircrew operating Air Force aircraft.
Backpack-style
2
The LPP is equipped with a Butler ____ high speed canopy that is rated for 416 pounds at 170 knots.
HX-500
3
The CYPRES AAD _____ device to the manual activation of the parachute in the event that the user is unable to pull the ripcord
Backup
4
After the arming pin is pulled, the unit will activate the parachute deployment if the user is falling vertically faster than ______ miles-per-hour below _____ feet
78 Miles; 14,000 Feet
5
The oxygen bailout bottle is a modified U.S Air Force bottle (MS22069) with a _____ breathing hose
21 Inch
6
In the event AFE becomes excess to organizational needs, the _____ will notify their respective MAJCOM/FOA for possible redistribution prior to turn-in
AFES/AFE COR
7
AFE "RED-X" certified technicians will be a 1P071 (or equivalent). The first ____ in the chain of command may waive the 7-level requirement down to the minimum rank of senior airman (civilian or contractor equivalent) to clear "Red-X" discrepancies based on their experience and technical expertise.
O-6
8
_____ will establish a CTK program IAW DAFI 21-101, Aircraft and Equipment Maintenance Management, Chapter 8, to include MAJCOM/FOA, and Wing/Unit policy directives.
AFES
9
Document the training provided, and abatement equipment for everyone exposed to shop hazards on the individual’s _____ Employee Safety and Health Record, or equivalent
AF Form 55
10
Mobility packages will be inventoried and inspected for serviceability before and after each use and at least _______
Once a year
11
An AFE supervisor, minimum _____, will be among the first to deploy on the advanced echelon team. This person is tasked to coordinate efforts with agencies necessary to establish AFE operations
1P071
12
There are ______ Fire Division 1 indicates the greatest hazard. The hazard decreases with ascending fire division numbers from
4 fire division; Numbers 1,2,3,4
13
Octagon Fire division 1 indicates
Mass Explosion
14
CROSS Fire Division 2 indicates
Non-mass explosion, fragment producing
15
Inverted Triangle Fire Division 3 indicates
Mass Fire
16
Diamond Fire Division 4 indicates
Moderate Fire
17
When evacuation is considered necessary, or is required by other technical guidance, clear the area to a distance of______
300 Feet
18
Unless otherwise directed by the Base Fire Chief, provide a minimum of _____ fully charged fire extinguishers, suitable for the hazards involved, for immediate use at any location where AE is being handled
2
19
As a minimum, units will conduct and document an ______ inventory of all tools and equipment
Annually
20
At a minimum, individual issued equipment will be marked with __________
First name initial, Last Name, and employee number
21
A _____ is defined as a remnant of cloth purchased in bulk or a standardized, commercial quality, vendor-supplied shop cloth in general industrial, shop, and flightline operations
Rag
22
Which of the following is considered a Rag
CHEESECLOTH
23
The _____ will designate CTK custodians
Flight CC/SUPT
24
Consumables may be placed in CTKs. If so, they will be identified on the MIL as Consumables
TRUE
25
The EID will consist of ____ characters (numbers/letters) of which the first___ characters will be a unique WWID code.
9/4
26
Personnel engaged in work in industrial areas, performing maintenance on aircraft, vehicles, equipment or machinery will not wear___ of any material type.
Rings
27
______ will ensure removal of snow and ice from all facilities walkways, sidewalks, handicap ramps and work areas expediently where they may create a hazard or interfere with the work.
Facility Managers
28
When materials are stacked to a height less than 15 feet, maintain an ____inch clearance below ceiling sprinkler deflectors. If the stack is over 15 feet in height, increase the clearance to 36 inches (when only joists, rafters, beams and roof trusses exist, without a ceiling constructed below, a ____inches clearance will also be required.
18 inch; 36 inches
29
______ shall establish an emergency action plan. (T-0) Note: Employees shall know primary and secondary escape routes for every area of the building.
Supervisors
30
At least one portable fire extinguisher having a rating of at least 40-B shall be located outside of, and within ___feet of, the door opening into an inside liquid storage area.
10 feet
31
(Storage Outside) At least one portable fire extinguisher rated at least 20-B shall be located ___feet travel distance from any Class I or Class II liquid storage area outside of a storage room.
50 Feet
32
Use DAF Form____ (Figure 1-2), to request a waiver to TO system policies and procedures and TMSS. Due to the utilization of a common AF Form, block entries may be different than block titles.
Form 679
33
The _____assembly collects the available light and focuses it on the image intensifier assembly.
Objective lens assembly
34
The ____assembly amplifies the available light received from the objective lens.
Image intensifier
35
The _____assembly presents the intensified image to the human eye and compensates for variations in user eyesight.
Eyepiece lens
36
The operating temperature of the AN/AVS-9:
-25.6 degrees Fahrenheit (°F) (-32 °C) to +125.6 °F (+52 °C)
37
The storage temperature of the AN/AVS-9:
-31 °F (-35 °C) to +159.8 °F (+71 °C)
38
The room or area should appear dark (without the evidence of light entering the area) to your unaided eye after
approximately 10 minutes of dark adaptation.
39
Personnel performing maintenance on the AN/AVS-9 Series goggles must have
20/20 vision or vision corrected to 20/20 in at least one eye.
40
Always use a _________ or cotton-tipped applicator and isopropyl alcohol when cleaning the lens of the NVGs.
Quality cleaning instrument (micro-fiber cloth or lens pen)
41
The LBI (Low Battery Indicator) should start to blink when the voltage reading is
2.1 ±0.1 VDC
42
When purging the NVG, verify that the vacuum holds at -20 inch mercury for___ seconds.
15 seconds
43
On the purge control box, set the PUMP/NITROGEN switch to the NITROGEN position. Watch the gauge on the purge control box to see that it indicates____PSI.
3 ±1/2 PSI
44
Cycle between pumping the -20 inch mercury and 3 ±1/2 PSI of nitrogen for a total of____cycles.
3 cycles
45
Using the torque driver and screwdriver bit, torque the purge valve on the monocular to_____inch-ounces.
8 inch-ounces
46
Extended modified neck lanyards can be configured with ______________ not to exceed 54 inches (from end-to- end).
Gutted green 550 pound cord
47
An IPI will be performed by a current and qualified inspector, 1P0X1 or as designated by_______.
Unit Commander
48
IPI checklists will be standardized, reviewed, and approved by the unit _____Quality Assurance office.
QA
49
The pull force on the ejector snaps required to release is____.
7±2 pounds
50
What is the approximate length of the pilot parachute bridle line?
27 inches
51
When testing the ripcord pin, insert the pin into the ripcord pin block approximately____.
½ inch
52
When inspecting the ripcord pin for bends or cracks, apply a ____weight to the ripcord grip.
7 pound weight
53
COMBAT EDGE is designed to provide the tactical aircrew member with a pressure breathing for G (PBG) system for positive acceleration _____ protection at altitudes up to ______ feet.
(+4 to +9G); 50,000 feet
54
The Oxygen mask assembly (MBU-20/P) is available in how many sizes?
5
55
The CSU-17/P vest is available in how many sizes?
4
56
What is the torque requirement for the set screws of the 20/P mask when tightening the microphone assembly?
15±1 inch-ounces
57
For the CRU-94/P and CRU-120/P, the release force shall be between ______.
12 and 20 pounds
58
What is the length of the MBU-20/P strain relief cord and what is it made of?
100 pound cord; 49.5 inches
59
How many helmet sizes are there for the HGU-55/P?
3
60
How do you determine the proper helmet size when fitting it to an aircrew member?
Head length; head width
61
If head length falls within one helmet size and width falls within another helmet size, always choose the smaller size.
True
62
Adjust helmet so that center eye position to helmet edge roll distance is approximately ____ inches.
2±1/4 inches
63
The HGU-56/P is constructed of what material?
Graphite and polyethylene
64
How many positions are on the Intercommunication Unit (ICU)?
4
65
What are the four positions of the ICU?
OFF, LISTEN ONLY, TALK/LISTEN, AND HARDWARE
66
How many helmet sizes are there for the HGU-56/P helmet?
6
67
DD FORM ____is a Serviceable Tag- Material (yellow tag).
1574
68
DD FORM ____ is an Unserviceable (Condemned) RED Tag.
1577
69
DD FORM ____ is an unserviceable (Repairable) Tag.
1577-2
70
Which form is the Life Preserver Inspection Record Card?
AFTO Form 336
71
Which form is the Life Raft Inspection Record Card?
AFTO Form 337
72
Which form is the Survival Kit Record Card?
AFTO Form 338
73
Which form is the Pre-positioned Life Support Equipment form?
AFTO Form 46
74
Which form is used for annotating the Single Cell Life Preserver Data?
AFTO Form 446A
75
Which one-man life raft is authorized for pararescue applications only?
LRU-17/P
76
The Navy’s FLU-6/P is not authorized for the Air Force use.
True
77
When the LPU-9/P is used temporarily, the adjustment strap need not be tacked. Loose ends should be secured with two-turns of masking tape or equivalent.
True
78
Open racks or shelves may be used as a substitute for closed lockers. The shelves should be designed to allow storage of life rafts at least ____ inches from walls and ____ inches from the floor.
4 inches; 12 inches
79
Ideal conditions of a flotation room are a temperature of ____ degrees Fahrenheit and a relative humidity of ____ percent.
75°F; 60% humidity
80
Life rafts will be given a Periodic Inspection at the initial installation and periodically at intervals not to exceed ___of established intervals.
1 year ±10 days
81
A functional test will be performed every ____ Periodic inspection.
4th
82
The one man life raft shall be inflated to ___PSI.
2 PSI
83
The one man lift raft inflation time shall not exceed____.
2 minutes and 30 seconds
84
All one man lift rafts shall be given a buoyancy twist test during _____ Inspection and then during ____Test thereafter.
Initial; functional
85
One man life rafts shall inflate to their designed shape without restriction within ____ .
30 seconds
86
Using ______ inch blocks, insert one block under the buoyancy tube directly below the retaining tab. The other block should be placed in the same manner diagonally opposite to the first block.
two 3-1/2 inch blocks
87
One man life rafts may be stacked while undergoing the 6 hour leakage test.
True
88
The maximum test pressure of the one man life raft tubes is____.
2 PSI
89
The maximum test pressure of the floor canopy of the LRU-16/P IS ___.
.5 PSI
90
The threaded portion of the cylinder neck shall contain a minimum of ____ full threads to assure a firm cylinder seat within inflator body. Any cylinder with less than seven full threads shall be discarded.
7
91
There are ____basic methods for folding one-man life rafts for installation in survival kits.
4
92
How long is the length of the nylon cord of the sea anchor on the one-man life rafts?
14 inches
93
The hex nut on the FLU-P shall be torqued to ____using a 9/16 inch socket.
25±1 inch-pound
94
The Adult/child life preserver assembly incorporates the use of two single inflators, each containing a single _____ CO2 cylinder.
16 Grams
95
The adult/child life preserver assembly is a reversible vest type, designated to encircle the neck of adults and children that are over ____ old.
18 Months
96
Hydrostatic test shall be performed on F-2B or LRU-1/P life rafts at least___.
Once every 5 years
97
The time of inflation of the F-2B life raft to its design shape is ___.
60 seconds
98
The time of inflation of the 25-man life raft to its design shape is ___.
7 to 9 seconds
99
The time of inflation of the LRU-1/P life raft to its design shape is ___.
30 seconds
100
The open position of the vent manifold of the F-2 life raft is
Push In