暗記メーカー
ログイン
Staff
  • Angel Gonzalez

  • 問題数 100 • 4/27/2024

    記憶度

    完璧

    15

    覚えた

    35

    うろ覚え

    0

    苦手

    0

    未解答

    0

    アカウント登録して、解答結果を保存しよう

    問題一覧

  • 1

    The Butler USAF BA-30 Low Profile Parachute (LPP) Emergency Parachute system is a _____style parachute designed for aircrew operating Air Force aircraft.

    Backpack-style

  • 2

    The LPP is equipped with a Butler ____ high speed canopy that is rated for 416 pounds at 170 knots.

    HX-500

  • 3

    The CYPRES AAD _____ device to the manual activation of the parachute in the event that the user is unable to pull the ripcord

    Backup

  • 4

    After the arming pin is pulled, the unit will activate the parachute deployment if the user is falling vertically faster than ______ miles-per-hour below _____ feet

    78 Miles; 14,000 Feet

  • 5

    The oxygen bailout bottle is a modified U.S Air Force bottle (MS22069) with a _____ breathing hose

    21 Inch

  • 6

    In the event AFE becomes excess to organizational needs, the _____ will notify their respective MAJCOM/FOA for possible redistribution prior to turn-in

    AFES/AFE COR

  • 7

    AFE "RED-X" certified technicians will be a 1P071 (or equivalent). The first ____ in the chain of command may waive the 7-level requirement down to the minimum rank of senior airman (civilian or contractor equivalent) to clear "Red-X" discrepancies based on their experience and technical expertise.

    O-6

  • 8

    _____ will establish a CTK program IAW DAFI 21-101, Aircraft and Equipment Maintenance Management, Chapter 8, to include MAJCOM/FOA, and Wing/Unit policy directives.

    AFES

  • 9

    Document the training provided, and abatement equipment for everyone exposed to shop hazards on the individual’s _____ Employee Safety and Health Record, or equivalent

    AF Form 55

  • 10

    Mobility packages will be inventoried and inspected for serviceability before and after each use and at least _______

    Once a year

  • 11

    An AFE supervisor, minimum _____, will be among the first to deploy on the advanced echelon team. This person is tasked to coordinate efforts with agencies necessary to establish AFE operations

    1P071

  • 12

    There are ______ Fire Division 1 indicates the greatest hazard. The hazard decreases with ascending fire division numbers from

    4 fire division; Numbers 1,2,3,4

  • 13

    Octagon Fire division 1 indicates

    Mass Explosion

  • 14

    CROSS Fire Division 2 indicates

    Non-mass explosion, fragment producing

  • 15

    Inverted Triangle Fire Division 3 indicates

    Mass Fire

  • 16

    Diamond Fire Division 4 indicates

    Moderate Fire

  • 17

    When evacuation is considered necessary, or is required by other technical guidance, clear the area to a distance of______

    300 Feet

  • 18

    Unless otherwise directed by the Base Fire Chief, provide a minimum of _____ fully charged fire extinguishers, suitable for the hazards involved, for immediate use at any location where AE is being handled

    2

  • 19

    As a minimum, units will conduct and document an ______ inventory of all tools and equipment

    Annually

  • 20

    At a minimum, individual issued equipment will be marked with __________

    First name initial, Last Name, and employee number

  • 21

    A _____ is defined as a remnant of cloth purchased in bulk or a standardized, commercial quality, vendor-supplied shop cloth in general industrial, shop, and flightline operations

    Rag

  • 22

    Which of the following is considered a Rag

    CHEESECLOTH

  • 23

    The _____ will designate CTK custodians

    Flight CC/SUPT

  • 24

    Consumables may be placed in CTKs. If so, they will be identified on the MIL as Consumables

    TRUE

  • 25

    The EID will consist of ____ characters (numbers/letters) of which the first___ characters will be a unique WWID code.

    9/4

  • 26

    Personnel engaged in work in industrial areas, performing maintenance on aircraft, vehicles, equipment or machinery will not wear___ of any material type.

    Rings

  • 27

    ______ will ensure removal of snow and ice from all facilities walkways, sidewalks, handicap ramps and work areas expediently where they may create a hazard or interfere with the work.

    Facility Managers

  • 28

    When materials are stacked to a height less than 15 feet, maintain an ____inch clearance below ceiling sprinkler deflectors. If the stack is over 15 feet in height, increase the clearance to 36 inches (when only joists, rafters, beams and roof trusses exist, without a ceiling constructed below, a ____inches clearance will also be required.

    18 inch; 36 inches

  • 29

    ______ shall establish an emergency action plan. (T-0) Note: Employees shall know primary and secondary escape routes for every area of the building.

    Supervisors

  • 30

    At least one portable fire extinguisher having a rating of at least 40-B shall be located outside of, and within ___feet of, the door opening into an inside liquid storage area.

    10 feet

  • 31

    (Storage Outside) At least one portable fire extinguisher rated at least 20-B shall be located ___feet travel distance from any Class I or Class II liquid storage area outside of a storage room.

    50 Feet

  • 32

    Use DAF Form____ (Figure 1-2), to request a waiver to TO system policies and procedures and TMSS. Due to the utilization of a common AF Form, block entries may be different than block titles.

    Form 679

  • 33

    The _____assembly collects the available light and focuses it on the image intensifier assembly.

    Objective lens assembly

  • 34

    The ____assembly amplifies the available light received from the objective lens.

    Image intensifier

  • 35

    The _____assembly presents the intensified image to the human eye and compensates for variations in user eyesight.

    Eyepiece lens

  • 36

    The operating temperature of the AN/AVS-9:

    -25.6 degrees Fahrenheit (°F) (-32 °C) to +125.6 °F (+52 °C)

  • 37

    The storage temperature of the AN/AVS-9:

    -31 °F (-35 °C) to +159.8 °F (+71 °C)

  • 38

    The room or area should appear dark (without the evidence of light entering the area) to your unaided eye after

    approximately 10 minutes of dark adaptation.

  • 39

    Personnel performing maintenance on the AN/AVS-9 Series goggles must have

    20/20 vision or vision corrected to 20/20 in at least one eye.

  • 40

    Always use a _________ or cotton-tipped applicator and isopropyl alcohol when cleaning the lens of the NVGs.

    Quality cleaning instrument (micro-fiber cloth or lens pen)

  • 41

    The LBI (Low Battery Indicator) should start to blink when the voltage reading is

    2.1 ±0.1 VDC

  • 42

    When purging the NVG, verify that the vacuum holds at -20 inch mercury for___ seconds.

    15 seconds

  • 43

    On the purge control box, set the PUMP/NITROGEN switch to the NITROGEN position. Watch the gauge on the purge control box to see that it indicates____PSI.

    3 ±1/2 PSI

  • 44

    Cycle between pumping the -20 inch mercury and 3 ±1/2 PSI of nitrogen for a total of____cycles.

    3 cycles

  • 45

    Using the torque driver and screwdriver bit, torque the purge valve on the monocular to_____inch-ounces.

    8 inch-ounces

  • 46

    Extended modified neck lanyards can be configured with ______________ not to exceed 54 inches (from end-to- end).

    Gutted green 550 pound cord

  • 47

    An IPI will be performed by a current and qualified inspector, 1P0X1 or as designated by_______.

    Unit Commander

  • 48

    IPI checklists will be standardized, reviewed, and approved by the unit _____Quality Assurance office.

    QA

  • 49

    The pull force on the ejector snaps required to release is____.

    7±2 pounds

  • 50

    What is the approximate length of the pilot parachute bridle line?

    27 inches

  • 51

    When testing the ripcord pin, insert the pin into the ripcord pin block approximately____.

    ½ inch

  • 52

    When inspecting the ripcord pin for bends or cracks, apply a ____weight to the ripcord grip.

    7 pound weight

  • 53

    COMBAT EDGE is designed to provide the tactical aircrew member with a pressure breathing for G (PBG) system for positive acceleration _____ protection at altitudes up to ______ feet.

    (+4 to +9G); 50,000 feet

  • 54

    The Oxygen mask assembly (MBU-20/P) is available in how many sizes?

    5

  • 55

    The CSU-17/P vest is available in how many sizes?

    4

  • 56

    What is the torque requirement for the set screws of the 20/P mask when tightening the microphone assembly?

    15±1 inch-ounces

  • 57

    For the CRU-94/P and CRU-120/P, the release force shall be between ______.

    12 and 20 pounds

  • 58

    What is the length of the MBU-20/P strain relief cord and what is it made of?

    100 pound cord; 49.5 inches

  • 59

    How many helmet sizes are there for the HGU-55/P?

    3

  • 60

    How do you determine the proper helmet size when fitting it to an aircrew member?

    Head length; head width

  • 61

    If head length falls within one helmet size and width falls within another helmet size, always choose the smaller size.

    True

  • 62

    Adjust helmet so that center eye position to helmet edge roll distance is approximately ____ inches.

    2±1/4 inches

  • 63

    The HGU-56/P is constructed of what material?

    Graphite and polyethylene

  • 64

    How many positions are on the Intercommunication Unit (ICU)?

    4

  • 65

    What are the four positions of the ICU?

    OFF, LISTEN ONLY, TALK/LISTEN, AND HARDWARE

  • 66

    How many helmet sizes are there for the HGU-56/P helmet?

    6

  • 67

    DD FORM ____is a Serviceable Tag- Material (yellow tag).

    1574

  • 68

    DD FORM ____ is an Unserviceable (Condemned) RED Tag.

    1577

  • 69

    DD FORM ____ is an unserviceable (Repairable) Tag.

    1577-2

  • 70

    Which form is the Life Preserver Inspection Record Card?

    AFTO Form 336

  • 71

    Which form is the Life Raft Inspection Record Card?

    AFTO Form 337

  • 72

    Which form is the Survival Kit Record Card?

    AFTO Form 338

  • 73

    Which form is the Pre-positioned Life Support Equipment form?

    AFTO Form 46

  • 74

    Which form is used for annotating the Single Cell Life Preserver Data?

    AFTO Form 446A

  • 75

    Which one-man life raft is authorized for pararescue applications only?

    LRU-17/P

  • 76

    The Navy’s FLU-6/P is not authorized for the Air Force use.

    True

  • 77

    When the LPU-9/P is used temporarily, the adjustment strap need not be tacked. Loose ends should be secured with two-turns of masking tape or equivalent.

    True

  • 78

    Open racks or shelves may be used as a substitute for closed lockers. The shelves should be designed to allow storage of life rafts at least ____ inches from walls and ____ inches from the floor.

    4 inches; 12 inches

  • 79

    Ideal conditions of a flotation room are a temperature of ____ degrees Fahrenheit and a relative humidity of ____ percent.

    75°F; 60% humidity

  • 80

    Life rafts will be given a Periodic Inspection at the initial installation and periodically at intervals not to exceed ___of established intervals.

    1 year ±10 days

  • 81

    A functional test will be performed every ____ Periodic inspection.

    4th

  • 82

    The one man life raft shall be inflated to ___PSI.

    2 PSI

  • 83

    The one man lift raft inflation time shall not exceed____.

    2 minutes and 30 seconds

  • 84

    All one man lift rafts shall be given a buoyancy twist test during _____ Inspection and then during ____Test thereafter.

    Initial; functional

  • 85

    One man life rafts shall inflate to their designed shape without restriction within ____ .

    30 seconds

  • 86

    Using ______ inch blocks, insert one block under the buoyancy tube directly below the retaining tab. The other block should be placed in the same manner diagonally opposite to the first block.

    two 3-1/2 inch blocks

  • 87

    One man life rafts may be stacked while undergoing the 6 hour leakage test.

    True

  • 88

    The maximum test pressure of the one man life raft tubes is____.

    2 PSI

  • 89

    The maximum test pressure of the floor canopy of the LRU-16/P IS ___.

    .5 PSI

  • 90

    The threaded portion of the cylinder neck shall contain a minimum of ____ full threads to assure a firm cylinder seat within inflator body. Any cylinder with less than seven full threads shall be discarded.

    7

  • 91

    There are ____basic methods for folding one-man life rafts for installation in survival kits.

    4

  • 92

    How long is the length of the nylon cord of the sea anchor on the one-man life rafts?

    14 inches

  • 93

    The hex nut on the FLU-P shall be torqued to ____using a 9/16 inch socket.

    25±1 inch-pound

  • 94

    The Adult/child life preserver assembly incorporates the use of two single inflators, each containing a single _____ CO2 cylinder.

    16 Grams

  • 95

    The adult/child life preserver assembly is a reversible vest type, designated to encircle the neck of adults and children that are over ____ old.

    18 Months

  • 96

    Hydrostatic test shall be performed on F-2B or LRU-1/P life rafts at least___.

    Once every 5 years

  • 97

    The time of inflation of the F-2B life raft to its design shape is ___.

    60 seconds

  • 98

    The time of inflation of the 25-man life raft to its design shape is ___.

    7 to 9 seconds

  • 99

    The time of inflation of the LRU-1/P life raft to its design shape is ___.

    30 seconds

  • 100

    The open position of the vent manifold of the F-2 life raft is

    Push In