問題一覧
1
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA? Note: There are 2 correct answers to this question.
Manual maintenance, 100% check
2
Which master data object governs the relationship between supply source and demand source in the Kanban process?
Control cycle
3
You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question.
Create without material, Create in Kanban process
4
How would you define pegging in the context of Advanced Planning?
An evaluation that is ordered according to the bill-of-material structure ohm related products and represents the relationship between the receipt and the issue elements
5
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
Planning at assembly level (70)
6
How can you characterize dependent requirements in material requirements planning? Note: There are 2 correct answers to this question.
They are created when an independent requirement is created for the finished product., They are created on assembly level during the planning run.
7
What do you need to consider when working with material master numbering in SAP S/4HANA? Note: There are 2 correct answers to this question.
The maximum material number length is 40 for external numbers and 18 for internal numbers., Material numbering is defined at client level.
8
You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 3 correct answers to this question.
Model a goods receipt time in the material roaster., Model a transportation lane and carrier selection in the location master., Model a handling resource in the location master.
9
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
Non-stock item, Variable-size item
10
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.
Planned delivery time , In-house production time
11
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.
Scheduling agreement schedule line, Planned order
12
Why would you use phantom assemblies? Note: There are 3 correct answers to this question
To make the assignment of components easier, To reduce the number of changes required in bills of material, To simplify the structure of hills of material
13
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
Material requirements planning
14
Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question.
Co-products, Waste products, By-products
15
Mode selection is one of the scheduling options available with Advanced Planning in SAP S4/HANA. When can you use mode selection?
When alternative resources are used within one operation
16
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
What status does the BOM have?, Is the material type allowed in the BOM?
17
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?
Planning with final assembly (40)
18
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
Routing, Work center
19
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.
Installation point , quantity
20
During production order creation, several valid production versions are found. How does the system choose the production version?
Validity period or sales order
21
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
Changing the stock in inventory management, Changing the procurement type in the product master, Changing the purchasing contract in materials management
22
You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.
The order lot size is NOT within the validity range of a production version., All production versions for the material are locked.
23
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.
Lot size, Manufacturing date
24
How can you limit the validity of a bill of material (BOM) Note: There are 2 correct answers to this question.
By plant, By period
25
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
Production orders are created with sales order reference., Sales orders have to be ATP-confirmed (available-to-promise) to be saved., Net requirements calculation is carried out for every sales order individually.
26
Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question.
Product type, Base unit of measure
27
You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?
Consumption-Based Planning
28
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.
Production version, Routing
29
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.
Queue time, Move time
30
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.
Procurement type, Material type