    What is the primary purpose of the cable jacket or sheath?

    Provide mechanical protection

  • 2

    When laying duct in a trench between two manholes, where should you start?

    Start at the midpoint where duct spacing is standard

  • 3

    By law, who is responsible for the pre-trip inspection of a fleet vehicle?

    C. The driver of the vehicle

  • 4

    When installing a heat shrink tube over a cable, you should start at one end and heat evenly working toward the other end to avoid bubbles from forming underneath the heat shrink.

    False

  • 5

    Duct runs are used to support cables along the wall of a manhole and maintain separation between different cables.

    False

  • 6

    Steel armors for cables are applied for mechanical strength and mechanical outer protection. What is the disadvantage of steel armors on single conductor cables?

    Magnetic properties of the steel affect the reactance of the circuit, which in turn affect the current carrying capacity of the cable

  • 7

    When working within a “contact area,” how many qualified personnel must be present?

    Two

  • 8

    What device if installed at strategic points in an underground system will aid in identifying faults or trouble locations?

    Fault indicators

  • 9

    All ground level electrical equipment must be securely locked and or protected to prevent the public, especially children from gaining access to energized parts.

    True

  • 10

    What is the Xcel Energy standard burial depth for primary cable?

    30 inches

  • 11

    Is a Vaultman or Cableman considered a qualified person?

    Yes

  • 12

    What is the following conductor shape?

    Compact sector

  • 13

    What does underground triplex cable consist of?

    Three insulated conductors with the neutral conductor being color-coded or marked in some manner for identification

  • 14

    What is used to spread irregular electric fields uniformly throughout the insulation on underground cables to protect the insulation from concentrated electrical stresses around the conductor?

    Strand shield

  • 15

    Manholes are used for primary distribution or secondary distribution, never both in the same hole.

    False

  • 16

    Employee’s working in an excavation may not be closer than __________ feet to the excavating equipment while it is in operation.

    15 feet

  • 17

    When removing semi-conducting material, why is it critical to make an even square cut?

    B. Jagged edges can cause premature failure of the cable

  • 18

    What reduces the friction between the cable and duct walls, especially on curves in the duct run, by as much as 70%?

    Cable lubrication

  • 19

    Why are cables racked along the walls of a manhole with large reverse curves formed in the cables?

    To allow for expansion and contraction of the cables due to temperature changes caused by changes in the power flow

  • 20

    Harmonics can increase power losses significantly in distribution circuits, causing major increase in unaccounted for energy and operating costs.

    True

  • 21

    Multi-conductor cables used for three-phase power circuits consist of three single conductor cables with a common sheath or jacket.

    True

  • 22

    When using live-line tools on energized cables or parts:

    D. Only A and B

  • 23

    What is used in the interstices of cables to give the complete assembly a substantially circular cross section?

    Cable filler tapes

  • 24

    Why are duct runs between manholes installed at a grade that slopes gently toward one or both manholes?

    It allows water seepage to drain out of the duct

  • 25

    Outrigger pads are used to insure the truck body remains stable.

    True

  • 26

    Which of the following is true in a common neutral system?

    The secondary and the primary share the same neutral

  • 27

    What condition will increase the magnitude of induced current from a magnetic field on an isolated, bracket grounded line?

    The length of parallel between the two conductors is increased

  • 28

    When is the wearing of a company approved hard hat not required?

    When working in the office or shop or while in a covered vehicle

  • 29

    What are the advantages of setting a recloser to non-reclose is that it provides for a faster operation time?

    The circuit will not be reenergized once it trips out

  • 30

    Ladders, ramps, ropes, or truck winch lines must be provided as a means of ingress and egress in all excavations when shoring is used and must be provided every 20 feet

    False

  • 31

    What type of insulation is used in shielded power cables, developed for experimental operation at 230 and 345 KV?

    Cross-linked polyethylene insulation (XLP)

  • 32

    A transformer that feeds series street light circuit is known as a:

    D. Only A and C

  • 33

    When circumstances require that the loop feeds be served from different phases or feeders, what must be installed at the opens in the loop feeds?

    Appropriate warning tags

  • 34

    How many load break elbows are required to terminate the primary in a single-phase transformer if it is between two other transformers?

    Two

  • 35

    What is used to prevent injury to the cable by scraping on the manhole frame or at the duct opening or in passing over other cables as it is being pulled into a duct run?

    A feeding tube

  • 36

    When digging near energized primary circuits that are not protected by fuses, what should be done to make the operation safer?

    Set the associated primary circuits on non-reclosing

  • 37

    What are the terms for large over voltages that develop suddenly on electric transmission and distribution circuits caused by switching operations or lightning?

    Surges or transients

  • 38

    When work is performed in a manhole or unventilated vault, no entry shall be permitted until the atmosphere is found safe by testing for what?

    D. Only A and B

  • 39

    The visible light output from a street light lamp is measured in watts and the energy input of a lamp is rated in lumens.

    False

  • 40

    How is aerial cable supported?

    The cable is attached to a tightly strung steel messenger cable with rings or lashing

  • 41

    What is normally used to terminate cables with solid dielectric insulation?

    Molded rubber terminators

  • 42

    Specific hazards to a lineman when a socket-connected (S-base) meter is plugged into a meter base with the top source energized are:

    All these

  • 43

    What is an advantage of an underground residential distribution system?

    It is relatively immune to damage from lightning, wind, and ice

  • 44

    The size of the conductor has no affect the level of fault current at a work location when working on a hot secondary circuit should a short circuit occur.

    False

  • 45

    When working on underground energized conductive materials in condition C or above live line tools shall be used. Under no circumstances should an employee’s hands approach closer than two feet six inches to the energized end of the live line tool.

    False

  • 46

    If a grounded vehicle were to become energized, the ground will prevent current from flowing through a person that is in contact with the vehicle.

    False

  • 47

    Insulation on unshielded cable, such as a covered conductor, cannot be depended upon for personal safety because:

    D. Only B and C

  • 48

    In pipe type cable construction, underground cable is pulled in to a pipe, which is filled with oil that is continually circulated through the pipe. What is the purpose of the oil?

    D. Only A. and C

  • 49

    Which of the following methods for assembling lattice steel towers is used when towers are large and heavy and the ground is rough?

    Piece by piece method: tower is assembled one piece at a time from the ground up

  • 50

    When installing a premolded straight and repair splice, the semicon shield must be thoroughly cleaned with cable solvent.

    False

  • 51

    What must be installed on the unused load break bushings in pad-mounted transformers and connected separately to the ground bus with a hot line clamp?

    An elbow arrester

  • 52

    Tracer wire shall be installed on all:

    All these

  • 53

    What is a precaution the cable splicer should take prior to beginning a cable splice?

    D. Only A and C

  • 54

    What device is used to keep the natural twist of the pulling line from causing the cable to twist or rotate as it is being pulled in?

    A swivel is installed between the pulling line and the cable

  • 55

    Identify the following conductor shape?

    Segmental

  • 56

    What does the level of fault current at a work location depend on when working on a hot secondary circuit?

    D. Only A and B

  • 57

    Additional conductors shall not be pulled into a duct already occupied by an energized conductor.

    True

  • 58

    What type of surge arrestor is commonly found on a primary distribution system?

    Distribution class valve type surge arrester

  • 59

    What should be done prior to switching primary cables in dead front 25 KV equipment to provide an additional margin of safety?

    D. Only B and C

  • 60

    Prior to shipping cable on a real, the manufacture is required to hermetically seal both ends of the cable. How is this done?

    By installing heat shrinkable polyethylene caps or hand tapping

  • 61

    When working in an excavation, stepping, standing or kneeling on energized underground cables is prohibited unless protected with rubber protective equipment.

    False

  • 62

    When opening an energized primary enclosure, what safety equipment shall be worn in addition to safety shoes and FR shirts?

    Hardhat, rubber gloves, and eye protection

  • 63

    What is a manhole?

    It is an opening in an underground duct system which houses cable, splices, and allows access for testing, splicing, and pulling cable

  • 64

    What is the term for circuits that carry power from distribution substations to local load areas?

    Express feeders, distribution main feeders, or primary circuits

  • 65

    What conditions for an excavation will identify the need for shoring, or providing the angle of repose to be sloped or benched to the correct angle as indicated on the excavation checklist?

    The excavation is five feet or greater in depth or a competent person deems the excavation hazardous

  • 66

    What underground voltage condition applies to energized equipment known to be above 15,000 volts and not exceeding 44,000 volts phase to phase that do not fall under other voltage conditions?

    Condition C

  • 67

    When will qualified personnel wear rubber gloves while engaged in energized underground distribution work?

    At all times

  • 68

    When working on or near energized equipment, how must your shirt sleeves be worn?

    Full-length sleeves must be secured at the wrist

  • 69

    What must be done to primary cables before they are cut?

    Primary cables will be de-energized, tested and grounded at both ends and spiked before being cut

  • 70

    When ducts terminate in vaults, manhole or hand hole _________ are installed to create a watertight duct entry system.

    manufactured duct terminators or end bells

  • 71

    If a conduit run must be installed under a paved roadway, body of water, or an environmentally sensitive area, what method can be used to accomplish the task and leave the surface unmolested?

    Directional boring method

  • 72

    Energized primary enclosures shall be attended by a qualified person while open and securely locked when closed

    True

  • 73

    Why should cables be pulled into a duct run slowly?

    To allow for proper inspection and lubrication of the cable

  • 74

    When working on energized underground conductive materials in condition “b” or above, approved live line tools shall be used.

    True

  • 75

    What is the term for a hollow tube, made of plastic, fiberglass, fiber, tile, concrete, or steel, that runs from manhole to manhole in an underground electric system?

    Conduits or ducts

  • 76

    Which of the following is true concerning cables energized at voltages at 600 volts or less normal operating range?

    They may be moved under the direction of the person in charge unless the cable is noticeably warm or the movement will cause a short radius bend

  • 77

    What is a template used for in transmission anchor construction?

    A template is used to ensure the anchors are constructed to the dimensions that will line up with the lower portion of the tower

  • 78

    When an employee is in a manhole, a second employee is stationed on the surface near the manhole. What is the second employee’s purpose?

    To pass material and be available to help or initiate rescue procedures

  • 79

    When untying energized conductors with hot tie sticks, you should cut the tie as close as possible to eliminate the possibility of making contact with a different potential?

    True

  • 80

    When using automated cable pulling equipment, the duct can be cleaned and the pulling line installed at the same time. How is this done?

    The pulling line is attached to a double disk birdie, which is blown through the duct with compressed air

  • 81

    When energized conductor cables must be moved, how is this accomplished safely?

    D. Both A. and B

  • 82

    The insulation best suited for a specific cable depends on many factors. Which of the following are factors considered?

    Operating voltage, current load, type of installation, and ambient temperature

  • 83

    Network protectors in service that are found in an “open” position and will not “close” automatically should be closed manually as soon as possible to avoid a possible outage.

    False

  • 84

    Which type of sheath has experience shown to be the most effective protection for insulation against moisture, weather, and oxidation?

    Intact lead

  • 85

    Prior to entering a manhole, what should employees inspect the interior for?

    All of these

  • 86

    What causes fault indicators to trip?

    A high magnetic field due to fault current

  • 87

    On underground cable, what would cause the cable to fail prematurely due to voltage induced electrical stresses?

    All these

  • 88

    Stringing a fourth conductor on a delta system and changing the transformer connections from delta to WYE increases load carrying capacity _________%.

    73

  • 89

    Protective creams shall be used to protect skin when exposed to askarels, joint compounds, pulling compounds or similar skin irritants.

    True

  • 90

    When a faulted cable is exposed for repair, what should be done before the cable is handled?

    All of these

  • 91

    “Contact area” is defined as any location within or from which the worker’s body is within reaching, falling, or extended reach of energized conductive materials beyond stress relief and has a potential of ___________ normal operating range.

    650 V

  • 92

    Splices should be installed in transformer cabinets or basements to allow for extra slack for switching.

    False

  • 93

    All primary cables in a manhole or vault shall be fireproofed with an approved fireproofing tape such as Scotch 77.

    True

  • 94

    What can be placed in trenches to mark the location of underground electrical facilities?

    Red or yellow marker tape, and/or marker balls

  • 95

    Why are terminator ground wires routed a minimum of three inches away from metal brackets on a terminal pole?

    To prevent radio interference

  • 96

    What is a two-way manhole?

    An underground chamber where cables enter or leave in only two directions

  • 97

    On single-phase riser poles, terminators can be placed on the same pole with a transformer as long as they are provided with wildlife protection and arresters.