4.3 Timing

4.3 Timing
23問 • 2年前
  • Nami Chubachi
  • 通報

    問題一覧

  • 1

    Aims

    manufacturer, tolerances, beat, amplitude, instantaneous, daily, power reserve, elimination, given order, chronoscope

  • 2

    Rate

    quality, satisfaction, chronoscope

  • 3

    Process Workflow

    1 front counter, 2 estimation, 3 timing, 4 estimate, 5 customer answer, 6 service engaged, 7 decasing, 8 refinishing, 9 cleaning, 10 assembly, 11 inspection, 12 refinishing, 13 cleaning, 14 assembly, 15 inspection, 16 disassembly, 17 cleaning, 18 assembly, 19 timing analysis, 20 timing analysis, 21 automatic, 22 complete, 23 dial fitting casing up, 24 timing analysis, 25 visual inspection, 26 fitting, 27 final control, 28 invoicing, 29 front counter

  • 4

    Action Zone - Oscillator

    oscillator, inertia, parachrom, microstella

  • 5

    Preliminary Operations

    check, without, mainspring, wear, lubricate, escapement, endshakes, balance, hairspring, demagnetise

  • 6

    Preliminary Operations - Using the WITSCHI

    131, mrws, witschi, lift angle

  • 7

    Preliminary Operations - Using the WITSCHI 2

    bph, 28800, 52, tolerance, ms, 0.5, 310, 200, 12, -1 +3, 44, 4.8, chronograph, countdown, crown

  • 8

    Preliminary Operations - Timing Positions

    vertical, horizontal, vertical down, vertical left, vertical up, horizontal up, horizontal down

  • 9

    Preliminary Operations - Using the WITSCHI 3

    beat, amplitude, gain loss

  • 10

    Preliminary Operations - Using the WITSCHI 4

    rate values, 0

  • 11

    Beat

    beat, axis, pallet fork, dead point, unwound, length, beat error, milliseconds, graphically, lower

  • 12

    Beat 2

    stud support regulator

  • 13

    Beat 3

    single line, 0.0 ms, mobile stud support regulator, collet

  • 14

    Beat 4

    oscillation, vibration, amplitude, displacement

  • 15

    Amplitude 1

    24, vertical down, degrees, fully

  • 16

    Amplitude 2

    fully, horizontally, dial up, degrees, knocking

  • 17

    Regulation - Adjustment Using a Microstella Key

    gain, loss, same, small

  • 18

    Analysing the Results - first criterion

    10, isochronism, seconds

  • 19

    Analysing the Results - Second criterion

    five, 0, precision, seconds, 24, rate, second

  • 20

    Analysing the Results - Daly Rate Observation

    instantaneous, daily, 0, 24, cyclostock 36, 3, 24

  • 21

    Analysing the Results - Power Reserve

    wound, unwound, hours, minutes, cyclostock, dial up, 24, 36, 68

  • 22

    Observations

    tightened, +3, +2, -1, 1.4, 24

  • 23

    conclusion

    subsequent, followed, discernment, old

  • 3.1 Introduction To Watchmaking

    3.1 Introduction To Watchmaking

    Nami Chubachi · 30問 · 2年前

    3.1 Introduction To Watchmaking

    3.1 Introduction To Watchmaking

    30問 • 2年前
    Nami Chubachi

    3.2 Lubrication

    3.2 Lubrication

    Nami Chubachi · 16問 · 2年前

    3.2 Lubrication

    3.2 Lubrication

    16問 • 2年前
    Nami Chubachi

    3.7 Quartz

    3.7 Quartz

    Nami Chubachi · 27問 · 2年前

    3.7 Quartz

    3.7 Quartz

    27問 • 2年前
    Nami Chubachi

    3.8 Cacing

    3.8 Cacing

    Nami Chubachi · 16問 · 2年前

    3.8 Cacing

    3.8 Cacing

    16問 • 2年前
    Nami Chubachi

    4.1 Escapement

    4.1 Escapement

    Nami Chubachi · 17問 · 2年前

    4.1 Escapement

    4.1 Escapement

    17問 • 2年前
    Nami Chubachi

    問題一覧

  • 1

    Aims

    manufacturer, tolerances, beat, amplitude, instantaneous, daily, power reserve, elimination, given order, chronoscope

  • 2

    Rate

    quality, satisfaction, chronoscope

  • 3

    Process Workflow

    1 front counter, 2 estimation, 3 timing, 4 estimate, 5 customer answer, 6 service engaged, 7 decasing, 8 refinishing, 9 cleaning, 10 assembly, 11 inspection, 12 refinishing, 13 cleaning, 14 assembly, 15 inspection, 16 disassembly, 17 cleaning, 18 assembly, 19 timing analysis, 20 timing analysis, 21 automatic, 22 complete, 23 dial fitting casing up, 24 timing analysis, 25 visual inspection, 26 fitting, 27 final control, 28 invoicing, 29 front counter

  • 4

    Action Zone - Oscillator

    oscillator, inertia, parachrom, microstella

  • 5

    Preliminary Operations

    check, without, mainspring, wear, lubricate, escapement, endshakes, balance, hairspring, demagnetise

  • 6

    Preliminary Operations - Using the WITSCHI

    131, mrws, witschi, lift angle

  • 7

    Preliminary Operations - Using the WITSCHI 2

    bph, 28800, 52, tolerance, ms, 0.5, 310, 200, 12, -1 +3, 44, 4.8, chronograph, countdown, crown

  • 8

    Preliminary Operations - Timing Positions

    vertical, horizontal, vertical down, vertical left, vertical up, horizontal up, horizontal down

  • 9

    Preliminary Operations - Using the WITSCHI 3

    beat, amplitude, gain loss

  • 10

    Preliminary Operations - Using the WITSCHI 4

    rate values, 0

  • 11

    Beat

    beat, axis, pallet fork, dead point, unwound, length, beat error, milliseconds, graphically, lower

  • 12

    Beat 2

    stud support regulator

  • 13

    Beat 3

    single line, 0.0 ms, mobile stud support regulator, collet

  • 14

    Beat 4

    oscillation, vibration, amplitude, displacement

  • 15

    Amplitude 1

    24, vertical down, degrees, fully

  • 16

    Amplitude 2

    fully, horizontally, dial up, degrees, knocking

  • 17

    Regulation - Adjustment Using a Microstella Key

    gain, loss, same, small

  • 18

    Analysing the Results - first criterion

    10, isochronism, seconds

  • 19

    Analysing the Results - Second criterion

    five, 0, precision, seconds, 24, rate, second

  • 20

    Analysing the Results - Daly Rate Observation

    instantaneous, daily, 0, 24, cyclostock 36, 3, 24

  • 21

    Analysing the Results - Power Reserve

    wound, unwound, hours, minutes, cyclostock, dial up, 24, 36, 68

  • 22

    Observations

    tightened, +3, +2, -1, 1.4, 24

  • 23

    conclusion

    subsequent, followed, discernment, old