ログイン

C4 - Use of ECDIS for the safety of navigation (100-157)

C4 - Use of ECDIS for the safety of navigation (100-157)
57問 • 2年前
  • Joedz Padin
  • 通報

    問題一覧

  • 1

    101. Why mariners using ECDIS are reminded not to rely solely on automated voyage planing and monitoring checks and alarms?

    •Some ECDIS appear only to undertake route check functions on larger scale ENCs and therfore alarms might not activate

  • 2

    102. What shall be used for areas covered by ENC ?

    •Only ENC shall be used for navigation.

  • 3

    103. From 1 January 2017, to meet the competence requirements of the 2010 Manila Amendments to the STCW Convention and ISM Code, what should be undertaken by Masters and Officers in charge of a Navigational watch (both Management and Operational level) serving on ships fitted with ECDIS?

    •Appropriate generic ECDIS training

  • 4

    104. What is the digital form by the national hydrographic authority, containing chart iformation and other nautical hydrographic information?

    •ECDB.

  • 5

    105. What is the process required in order to assure and demonstrate competency on board any specific ship's ECDIS instalation prior to taking charge of a navigational watch?

    •Familiarization

  • 6

    106. If the Electronic chart is part of an ECDIS, it must display the minimum data required by IMO/IHO to include all of the following EXCEPT which item?

    •Tidal Currents

  • 7

    107. Which of the following is the product specification of the produced Electronic Navigational Chart?

    •IHO S-57

  • 8

    108. Which organizations that is authorized by governments to survey ships flying their flag and ensure that ships meet the ECDIS required standards?

    •Classification Societies

  • 9

    109. Which cross-check will provide continuous positional information for ECDIS?

    Radar overlay

  • 10

    110. Which of the following statement is/are true with regards to the ECDIS in the Integrated Bridge System? I. This will not lower the overall worked load of the bridge officer. II. It increases the percentage of the time that bridge officers can devote to collision avoidance. III. The system is most the same in design to meet the requirement of the system of integration. IV. It became a mandatory that its installation and design criteria is laid out by classification societies.

    •I and II only

  • 11

    111. What is meant by "harmonization" in using the ECDIS to maintain the safety of navigation?

    •The process of updating the ECDIS with the same software version.

  • 12

    112. Can you create a manual update on a NAVTEX message shown on the ECDIS?

    •Yes, by manually creating the object

  • 13

    113. These are the three advantages of an ECDIS EXCEPT:

    •Too much information

  • 14

    114. The following describe the factors to consider when determining Electronic Chart Display and Information System (ECDIS) limitations EXCEPT:

    •Sensor input

  • 15

    115. In ECDIS operations, what type of symbol should you use for creating manual update?

    •Standard orange symbol

  • 16

    116. This is an electronic chart that is a facsimile of a paper chart when used for navigation the information and data cannot be obtained by interrogation. What is this electronic chart??

    •Raster

  • 17

    117. These are the three (3) disadvantages of an ECDIS EXCEPT:

    •Navigation in real time

  • 18

    118. In the ECDIS operation, where do you change the target past position density?

    •In the Symbol Dispaly

  • 19

    119. To achieve a sensible and considered meaning and alarm settings of the ECDIS, what are the values that must be understood and entered?

    •Safety depth and safety contour.

  • 20

    120. This chart only grows larger or smaller as per the zooming. What do you call this type of chart that is a direct copy of the paper chart so that it will look identical as all the information are printed?

    •Raster Chart

  • 21

    121. The following are the limitations of Raster Navigational Charts ECXCEPT:

    •Data can be represented at its original resolution and form without generalization.

  • 22

    122. What describes the ECDIS operational and performance requirements and provide methods for the required result?

    •International Electro Technical Ciommision (IEC) Standard 61174

  • 23

    123. What is the digitized "picture of a chart comprised of millions of "picture elements" or "pixels"?

    •Raster chart data

  • 24

    124. Which of the following is TRUE when you are using the RNC chart?

    •It must be used together with paper charts.

  • 25

    125. The following are the defining characteristics of RNC EXCEPT :

    •Expensive and time consumin

  • 26

    126. What is the recommended maximum duration that ECDIS stores the own ship's movement?

    •4 hours

  • 27

    127. Which of the following data layer categories is NOT displayed on ECDIS ?

    •Ship hydrodynamic information

  • 28

    128. Why should Navigating Officer carry out checks while carrying out passage planning on ECDIS?

    •Not all sea areas are covered by ENC charts.

  • 29

    129. What is the worldwide digital dataset that is designed to be displayed over ENCs in ECDIS and other chart display systems to provide additional information during passage planning?

    •Admiralty Information Overlay.

  • 30

    130. The following are the File Formats for Vector images EXCEPT:

    •.bmp ( Bitmap Image File)

  • 31

    131. The following setting are available to the ECDIS user for highlighting available depth EXCEPT:

    •Shallow depth

  • 32

    132. All IMO vessels over 10,000 GT on top of other vessels are requested to install and operate ECDIS. How would you comply with the carriage requirement of ECDIS?

    •If vessel carry a type approved ECDIS and its back up arrangement

  • 33

    133. Which of the following cases is " FALSE " that ECDIS will activate an alarm?

    •If a target enter the boundary limit set by OOW on specified danger areas.

  • 34

    134. What Digital Chart Data Formats ECDIS units should incorporate?

    •Vector and Raster

  • 35

    135. Which of the following is NOT an advantage of Raster chart?

    •Zooming reveals details

  • 36

    136. Compliance with regulatory requirements for generic training and familiarization in ECDIS including the required competencies are incrfeasingly being examined by these following external parties EXCEPT:

    •Pilots

  • 37

    137. How do you switch from S-57 to ARCS Chart on the ECDIS?

    •Select ARCS Chart in Chart Menu.

  • 38

    138. What is the database of ECDIS issued by hydrographic offfice that contains all chart information needed for safe navigation and may contain supplemental information?

    •ENC

  • 39

    139. Why Raster charts cannot take the place of paper charts?

    •Because when an ECDIS uses raster charts it operates in ECS mode, to be used in conjunction with corrected paper charts.

  • 40

    140. What should be presented by the ECDIS at anytime by a single operator action ?

    •Standard display

  • 41

    141. Can you create a manual update of a Navtex Message shown on the ECDIS?

    •Yes, by manually creating the object

  • 42

    142. The IMO Performance Standards for ECDIS require that adequate back-up arrangements should be provided to ensure safe navigation in case of an ECDIS failure. There are various ways for a vessel to achieve this by using the following, EXCEPT:

    •Worldwide Electronic Navigational Chart Database.

  • 43

    143. What is the ECDIS setting that indicates the non-navigable area and marks the boundary outside of which the vessel may safely navigate?

    •Shallow contour.

  • 44

    144. Identify which of the following primary information should always appear on ECDIS during route monitoring mode?

    •Selected route

  • 45

    145. How are loaded ENCs converted into SENCs when updating?

    •The ECDIS will normally convert the ENCs to SENCs automatically

  • 46

    146. The following are the File Formats for Raster images EXCEPT:

    •.ai (Adobe Illustrator Document

  • 47

    147. On the following, what example of a SENC information can you find available on a display base which is permanently shown on ECDIS display?

    •Coast line

  • 48

    148. Which of the following cases must an ECDIS gives an alarm?

    •When the specified limit for deviation from the planned route is exceeded.

  • 49

    149. In ECDIS, what is harmonization?

    •The process of updating the ECDIS with the same software version

  • 50

    150. What should be presented by the ECDIS at anytime by a single operator action?

    •Standard display

  • 51

    151. Which of the following is a mandatory equipment that must be connected to ECDIS?

    •Positional navigation Sensors (e.g. GPS)

  • 52

    152. In passage planning with ECDIS, what is the stage where collection and validation of all of relevant information are being done?

    •Appraisal

  • 53

    153. During route planning and route monitoring, the following SENC information available for display should be subdivided into the following categories EXCEPT:

    •North up display

  • 54

    154. In which document will you find the Performance Standard for ECDIS?

    •IMO Resolution A.817(19)

  • 55

    155. The regulatory requirements for generic training and familiaization in ECDIS are covered by these international instruments EXCEPT:

    •IHO

  • 56

    156. Frequent checks should be made of the ECDIS position fixing system (normally GPS) by the use of other means to cross check and determine vessel's position. Such checks should include the following methods EXCEPT:

    •Running fix

  • 57

    157. How many hours that an ECDIS will be able to preserve the record of the previous track?

    •12 hours

  • C1 - Plan and conduct a passage and determine position (200)

    C1 - Plan and conduct a passage and determine position (200)

    Joedz Padin · 100問 · 2年前

    C1 - Plan and conduct a passage and determine position (200)

    C1 - Plan and conduct a passage and determine position (200)

    100問 • 2年前
    Joedz Padin

    C1 - Plan and conduct a passage and determine position (300)

    C1 - Plan and conduct a passage and determine position (300)

    Joedz Padin · 100問 · 2年前

    C1 - Plan and conduct a passage and determine position (300)

    C1 - Plan and conduct a passage and determine position (300)

    100問 • 2年前
    Joedz Padin

    C1 - Plan and conduct a passage and determine position (400)

    C1 - Plan and conduct a passage and determine position (400)

    Joedz Padin · 3回閲覧 · 100問 · 2年前

    C1 - Plan and conduct a passage and determine position (400)

    C1 - Plan and conduct a passage and determine position (400)

    3回閲覧 • 100問 • 2年前
    Joedz Padin

    C1 - Plan and conduct a passage and determine position (400-419)

    C1 - Plan and conduct a passage and determine position (400-419)

    Joedz Padin · 19問 · 2年前

    C1 - Plan and conduct a passage and determine position (400-419)

    C1 - Plan and conduct a passage and determine position (400-419)

    19問 • 2年前
    Joedz Padin

    C2 - Maintain a safe navigational watch (100)

    C2 - Maintain a safe navigational watch (100)

    Joedz Padin · 100問 · 2年前

    C2 - Maintain a safe navigational watch (100)

    C2 - Maintain a safe navigational watch (100)

    100問 • 2年前
    Joedz Padin

    C2 - Maintain a safe navigational watch(200)

    C2 - Maintain a safe navigational watch(200)

    Joedz Padin · 100問 · 2年前

    C2 - Maintain a safe navigational watch(200)

    C2 - Maintain a safe navigational watch(200)

    100問 • 2年前
    Joedz Padin

    C2 - Maintain a safe navigational watch (200-221)

    C2 - Maintain a safe navigational watch (200-221)

    Joedz Padin · 3回閲覧 · 21問 · 2年前

    C2 - Maintain a safe navigational watch (200-221)

    C2 - Maintain a safe navigational watch (200-221)

    3回閲覧 • 21問 • 2年前
    Joedz Padin

    C3 - Use of Radar and ARPA for the safety of navigation (100)

    C3 - Use of Radar and ARPA for the safety of navigation (100)

    Joedz Padin · 100問 · 2年前

    C3 - Use of Radar and ARPA for the safety of navigation (100)

    C3 - Use of Radar and ARPA for the safety of navigation (100)

    100問 • 2年前
    Joedz Padin

    C3 - Use of Radar and ARPA for the safety of navigation (200)

    C3 - Use of Radar and ARPA for the safety of navigation (200)

    Joedz Padin · 100問 · 2年前

    C3 - Use of Radar and ARPA for the safety of navigation (200)

    C3 - Use of Radar and ARPA for the safety of navigation (200)

    100問 • 2年前
    Joedz Padin

    C3 - Use of Radar and ARPA for the safety of navigation (200-258)

    C3 - Use of Radar and ARPA for the safety of navigation (200-258)

    Joedz Padin · 57問 · 2年前

    C3 - Use of Radar and ARPA for the safety of navigation (200-258)

    C3 - Use of Radar and ARPA for the safety of navigation (200-258)

    57問 • 2年前
    Joedz Padin

    C4 - Use of ECDIS for the safety of navigation (100)

    C4 - Use of ECDIS for the safety of navigation (100)

    Joedz Padin · 100問 · 2年前

    C4 - Use of ECDIS for the safety of navigation (100)

    C4 - Use of ECDIS for the safety of navigation (100)

    100問 • 2年前
    Joedz Padin

    C5 - Respond to emergencies

    C5 - Respond to emergencies

    Joedz Padin · 99問 · 2年前

    C5 - Respond to emergencies

    C5 - Respond to emergencies

    99問 • 2年前
    Joedz Padin

    C7 - Use the IMO SMCP and use English in written and oral form(100)

    C7 - Use the IMO SMCP and use English in written and oral form(100)

    Joedz Padin · 100問 · 2年前

    C7 - Use the IMO SMCP and use English in written and oral form(100)

    C7 - Use the IMO SMCP and use English in written and oral form(100)

    100問 • 2年前
    Joedz Padin

    C7 - Use the IMO SMCP and se English in writtend and oral form (200)

    C7 - Use the IMO SMCP and se English in writtend and oral form (200)

    Joedz Padin · 95問 · 2年前

    C7 - Use the IMO SMCP and se English in writtend and oral form (200)

    C7 - Use the IMO SMCP and se English in writtend and oral form (200)

    95問 • 2年前
    Joedz Padin

    C9 - Manoeuvre the ship

    C9 - Manoeuvre the ship

    Joedz Padin · 100問 · 2年前

    C9 - Manoeuvre the ship

    C9 - Manoeuvre the ship

    100問 • 2年前
    Joedz Padin

    C9 - Manoeuvre the ship (100-174)

    C9 - Manoeuvre the ship (100-174)

    Joedz Padin · 74問 · 2年前

    C9 - Manoeuvre the ship (100-174)

    C9 - Manoeuvre the ship (100-174)

    74問 • 2年前
    Joedz Padin

    C10 - Monitor the loading, stowage, securing, care during the voyage and the unloading of cargoes

    C10 - Monitor the loading, stowage, securing, care during the voyage and the unloading of cargoes

    Joedz Padin · 3回閲覧 · 100問 · 2年前

    C10 - Monitor the loading, stowage, securing, care during the voyage and the unloading of cargoes

    C10 - Monitor the loading, stowage, securing, care during the voyage and the unloading of cargoes

    3回閲覧 • 100問 • 2年前
    Joedz Padin

    C10 - Monitor the loading, stowage, securing, care during the voyage and the unloading of cargoes (100-108)

    C10 - Monitor the loading, stowage, securing, care during the voyage and the unloading of cargoes (100-108)

    Joedz Padin · 8問 · 2年前

    C10 - Monitor the loading, stowage, securing, care during the voyage and the unloading of cargoes (100-108)

    C10 - Monitor the loading, stowage, securing, care during the voyage and the unloading of cargoes (100-108)

    8問 • 2年前
    Joedz Padin

    C11 - Inspect and report defects and damage to cargo spaces, hatch covers nd ballast tanks

    C11 - Inspect and report defects and damage to cargo spaces, hatch covers nd ballast tanks

    Joedz Padin · 94問 · 2年前

    C11 - Inspect and report defects and damage to cargo spaces, hatch covers nd ballast tanks

    C11 - Inspect and report defects and damage to cargo spaces, hatch covers nd ballast tanks

    94問 • 2年前
    Joedz Padin

    C12 - Ensure compliance with pollution-prevention requirements

    C12 - Ensure compliance with pollution-prevention requirements

    Joedz Padin · 100問 · 2年前

    C12 - Ensure compliance with pollution-prevention requirements

    C12 - Ensure compliance with pollution-prevention requirements

    100問 • 2年前
    Joedz Padin

    C12 - Ensure compliance with pollution-prevention requirements (100-110)

    C12 - Ensure compliance with pollution-prevention requirements (100-110)

    Joedz Padin · 10問 · 2年前

    C12 - Ensure compliance with pollution-prevention requirements (100-110)

    C12 - Ensure compliance with pollution-prevention requirements (100-110)

    10問 • 2年前
    Joedz Padin

    C13 - Maintain seaworthiness of the ship

    C13 - Maintain seaworthiness of the ship

    Joedz Padin · 100問 · 2年前

    C13 - Maintain seaworthiness of the ship

    C13 - Maintain seaworthiness of the ship

    100問 • 2年前
    Joedz Padin

    C13 - Maintain seaworthiness of the ship(100-122)

    C13 - Maintain seaworthiness of the ship(100-122)

    Joedz Padin · 22問 · 2年前

    C13 - Maintain seaworthiness of the ship(100-122)

    C13 - Maintain seaworthiness of the ship(100-122)

    22問 • 2年前
    Joedz Padin

    C17 - Monitor compliance with legislative requirments

    C17 - Monitor compliance with legislative requirments

    Joedz Padin · 97問 · 2年前

    C17 - Monitor compliance with legislative requirments

    C17 - Monitor compliance with legislative requirments

    97問 • 2年前
    Joedz Padin

    問題一覧

  • 1

    101. Why mariners using ECDIS are reminded not to rely solely on automated voyage planing and monitoring checks and alarms?

    •Some ECDIS appear only to undertake route check functions on larger scale ENCs and therfore alarms might not activate

  • 2

    102. What shall be used for areas covered by ENC ?

    •Only ENC shall be used for navigation.

  • 3

    103. From 1 January 2017, to meet the competence requirements of the 2010 Manila Amendments to the STCW Convention and ISM Code, what should be undertaken by Masters and Officers in charge of a Navigational watch (both Management and Operational level) serving on ships fitted with ECDIS?

    •Appropriate generic ECDIS training

  • 4

    104. What is the digital form by the national hydrographic authority, containing chart iformation and other nautical hydrographic information?

    •ECDB.

  • 5

    105. What is the process required in order to assure and demonstrate competency on board any specific ship's ECDIS instalation prior to taking charge of a navigational watch?

    •Familiarization

  • 6

    106. If the Electronic chart is part of an ECDIS, it must display the minimum data required by IMO/IHO to include all of the following EXCEPT which item?

    •Tidal Currents

  • 7

    107. Which of the following is the product specification of the produced Electronic Navigational Chart?

    •IHO S-57

  • 8

    108. Which organizations that is authorized by governments to survey ships flying their flag and ensure that ships meet the ECDIS required standards?

    •Classification Societies

  • 9

    109. Which cross-check will provide continuous positional information for ECDIS?

    Radar overlay

  • 10

    110. Which of the following statement is/are true with regards to the ECDIS in the Integrated Bridge System? I. This will not lower the overall worked load of the bridge officer. II. It increases the percentage of the time that bridge officers can devote to collision avoidance. III. The system is most the same in design to meet the requirement of the system of integration. IV. It became a mandatory that its installation and design criteria is laid out by classification societies.

    •I and II only

  • 11

    111. What is meant by "harmonization" in using the ECDIS to maintain the safety of navigation?

    •The process of updating the ECDIS with the same software version.

  • 12

    112. Can you create a manual update on a NAVTEX message shown on the ECDIS?

    •Yes, by manually creating the object

  • 13

    113. These are the three advantages of an ECDIS EXCEPT:

    •Too much information

  • 14

    114. The following describe the factors to consider when determining Electronic Chart Display and Information System (ECDIS) limitations EXCEPT:

    •Sensor input

  • 15

    115. In ECDIS operations, what type of symbol should you use for creating manual update?

    •Standard orange symbol

  • 16

    116. This is an electronic chart that is a facsimile of a paper chart when used for navigation the information and data cannot be obtained by interrogation. What is this electronic chart??

    •Raster

  • 17

    117. These are the three (3) disadvantages of an ECDIS EXCEPT:

    •Navigation in real time

  • 18

    118. In the ECDIS operation, where do you change the target past position density?

    •In the Symbol Dispaly

  • 19

    119. To achieve a sensible and considered meaning and alarm settings of the ECDIS, what are the values that must be understood and entered?

    •Safety depth and safety contour.

  • 20

    120. This chart only grows larger or smaller as per the zooming. What do you call this type of chart that is a direct copy of the paper chart so that it will look identical as all the information are printed?

    •Raster Chart

  • 21

    121. The following are the limitations of Raster Navigational Charts ECXCEPT:

    •Data can be represented at its original resolution and form without generalization.

  • 22

    122. What describes the ECDIS operational and performance requirements and provide methods for the required result?

    •International Electro Technical Ciommision (IEC) Standard 61174

  • 23

    123. What is the digitized "picture of a chart comprised of millions of "picture elements" or "pixels"?

    •Raster chart data

  • 24

    124. Which of the following is TRUE when you are using the RNC chart?

    •It must be used together with paper charts.

  • 25

    125. The following are the defining characteristics of RNC EXCEPT :

    •Expensive and time consumin

  • 26

    126. What is the recommended maximum duration that ECDIS stores the own ship's movement?

    •4 hours

  • 27

    127. Which of the following data layer categories is NOT displayed on ECDIS ?

    •Ship hydrodynamic information

  • 28

    128. Why should Navigating Officer carry out checks while carrying out passage planning on ECDIS?

    •Not all sea areas are covered by ENC charts.

  • 29

    129. What is the worldwide digital dataset that is designed to be displayed over ENCs in ECDIS and other chart display systems to provide additional information during passage planning?

    •Admiralty Information Overlay.

  • 30

    130. The following are the File Formats for Vector images EXCEPT:

    •.bmp ( Bitmap Image File)

  • 31

    131. The following setting are available to the ECDIS user for highlighting available depth EXCEPT:

    •Shallow depth

  • 32

    132. All IMO vessels over 10,000 GT on top of other vessels are requested to install and operate ECDIS. How would you comply with the carriage requirement of ECDIS?

    •If vessel carry a type approved ECDIS and its back up arrangement

  • 33

    133. Which of the following cases is " FALSE " that ECDIS will activate an alarm?

    •If a target enter the boundary limit set by OOW on specified danger areas.

  • 34

    134. What Digital Chart Data Formats ECDIS units should incorporate?

    •Vector and Raster

  • 35

    135. Which of the following is NOT an advantage of Raster chart?

    •Zooming reveals details

  • 36

    136. Compliance with regulatory requirements for generic training and familiarization in ECDIS including the required competencies are incrfeasingly being examined by these following external parties EXCEPT:

    •Pilots

  • 37

    137. How do you switch from S-57 to ARCS Chart on the ECDIS?

    •Select ARCS Chart in Chart Menu.

  • 38

    138. What is the database of ECDIS issued by hydrographic offfice that contains all chart information needed for safe navigation and may contain supplemental information?

    •ENC

  • 39

    139. Why Raster charts cannot take the place of paper charts?

    •Because when an ECDIS uses raster charts it operates in ECS mode, to be used in conjunction with corrected paper charts.

  • 40

    140. What should be presented by the ECDIS at anytime by a single operator action ?

    •Standard display

  • 41

    141. Can you create a manual update of a Navtex Message shown on the ECDIS?

    •Yes, by manually creating the object

  • 42

    142. The IMO Performance Standards for ECDIS require that adequate back-up arrangements should be provided to ensure safe navigation in case of an ECDIS failure. There are various ways for a vessel to achieve this by using the following, EXCEPT:

    •Worldwide Electronic Navigational Chart Database.

  • 43

    143. What is the ECDIS setting that indicates the non-navigable area and marks the boundary outside of which the vessel may safely navigate?

    •Shallow contour.

  • 44

    144. Identify which of the following primary information should always appear on ECDIS during route monitoring mode?

    •Selected route

  • 45

    145. How are loaded ENCs converted into SENCs when updating?

    •The ECDIS will normally convert the ENCs to SENCs automatically

  • 46

    146. The following are the File Formats for Raster images EXCEPT:

    •.ai (Adobe Illustrator Document

  • 47

    147. On the following, what example of a SENC information can you find available on a display base which is permanently shown on ECDIS display?

    •Coast line

  • 48

    148. Which of the following cases must an ECDIS gives an alarm?

    •When the specified limit for deviation from the planned route is exceeded.

  • 49

    149. In ECDIS, what is harmonization?

    •The process of updating the ECDIS with the same software version

  • 50

    150. What should be presented by the ECDIS at anytime by a single operator action?

    •Standard display

  • 51

    151. Which of the following is a mandatory equipment that must be connected to ECDIS?

    •Positional navigation Sensors (e.g. GPS)

  • 52

    152. In passage planning with ECDIS, what is the stage where collection and validation of all of relevant information are being done?

    •Appraisal

  • 53

    153. During route planning and route monitoring, the following SENC information available for display should be subdivided into the following categories EXCEPT:

    •North up display

  • 54

    154. In which document will you find the Performance Standard for ECDIS?

    •IMO Resolution A.817(19)

  • 55

    155. The regulatory requirements for generic training and familiaization in ECDIS are covered by these international instruments EXCEPT:

    •IHO

  • 56

    156. Frequent checks should be made of the ECDIS position fixing system (normally GPS) by the use of other means to cross check and determine vessel's position. Such checks should include the following methods EXCEPT:

    •Running fix

  • 57

    157. How many hours that an ECDIS will be able to preserve the record of the previous track?

    •12 hours