test
問題一覧
1
2 1/4"
2
SPAN
3
JOIST MUST HAVE BRIDGING
4
HELP CONTROL THE LOAD
5
THE DETAIL DRAWINGS
6
A.TENSILE STRENGTH A.COMPRESSIVE STRENGTH
7
COMPOSITE DECK
8
30'3"
9
DETAIL DRAWINGS
10
STRIKER
11
A.CONFIGURATION A.BALANCING
12
PING TEST
13
A.45 DEGREE LINES A.85 DEGREE LINE
14
THE FRONT AXLE
15
LIFT PLAN
16
IN THE GENERAL NOTES OF THE STRUCTURAL DRAWING
17
THE BENCHMARK
18
183FT
19
LOAD RADIUS
20
SLEEVER BAR
21
FORKS LOW
22
DETAIL
23
USE A SHACKLE
24
NO MORE THAN ONE
25
15PSIG
26
1/1500
27
BLOCKING
28
ALL STEEL IS ERECTED
29
60IN SQUARE
30
YIELD PRESSURE
31
OUTRIGGERS
32
SLINGS, SHACKLES, AND SPREADER BEAM
33
X-BRIDGING
34
IN A CONFINED SPACE
35
LUBRICATING THE ROPE
36
SAFETY DATA SHEET
37
SCREW PINS SHOULD BE BACKED OFF TWO TURNS
38
TO CLEAN THE CYLINDER VALVE OF FOREIGN MATERIAL
39
BULL PIN
40
VERTICLE ALIGNMENT POSITIONER
41
FROM THE BASE METAL THICKNESS AND FUEL TYPE BEING USED
42
HORIZONTAL BRIDGING A.VERTICAL CHORDS
43
IS STILL TURNING
44
20'
45
A BLOCK OF STEEL USED AS COUNTERWEIGHT
46
LUBRICANT
47
IN ALL POSITIONS
48
1’IN
49
30 MINUTES
50
ANTI TWO BLOCKING DEVICE
51
15 PSI
52
COPING
53
D:D RATIO
54
EXCESSIVE LUBRICATION
55
AN EXTENSION OF THE MAIN BOOM
56
THE COMPANY SAFETY DEPARTMENT
57
CELLULAR DECK
58
A307
59
GOOD HOUSEKEEPING
60
LATERAL ENDS
61
LATERAL ENDS
62
VERTICLE ALIGNMENT POSITIONER
63
CRAWLER CRANES
64
THREAD CHASER
65
WIND
66
CENTER OF GRAVITY
67
NIPPLE ON THE BOTTOM OF THE STUD
68
OXY-ACETYLENE WELDING
69
LASER LIGHT
70
GTAW
71
PROPERLY TESTED AND STAMPED
72
TWISTING OF THE BUNDLE
73
PASS A WELDING PERFORMANCE TEST
74
HIGH STRENGTH BOLT
75
THE NUMBER OF THE SUPERVISORS
76
BASKET
77
THE MANUFACTURER’S INSTRUCTION
78
GROUND FAUIT CIRCUIT INTERRUMPTER
79
TENSION/CONTROL BOLT
80
IN THE FEILD
81
10%
82
45
83
85 DEGREE LINE
84
RESISTANT TO TURNING
85
ALL THE PLUG
86
EVERYONE
問題一覧
1
2 1/4"
2
SPAN
3
JOIST MUST HAVE BRIDGING
4
HELP CONTROL THE LOAD
5
THE DETAIL DRAWINGS
6
A.TENSILE STRENGTH A.COMPRESSIVE STRENGTH
7
COMPOSITE DECK
8
30'3"
9
DETAIL DRAWINGS
10
STRIKER
11
A.CONFIGURATION A.BALANCING
12
PING TEST
13
A.45 DEGREE LINES A.85 DEGREE LINE
14
THE FRONT AXLE
15
LIFT PLAN
16
IN THE GENERAL NOTES OF THE STRUCTURAL DRAWING
17
THE BENCHMARK
18
183FT
19
LOAD RADIUS
20
SLEEVER BAR
21
FORKS LOW
22
DETAIL
23
USE A SHACKLE
24
NO MORE THAN ONE
25
15PSIG
26
1/1500
27
BLOCKING
28
ALL STEEL IS ERECTED
29
60IN SQUARE
30
YIELD PRESSURE
31
OUTRIGGERS
32
SLINGS, SHACKLES, AND SPREADER BEAM
33
X-BRIDGING
34
IN A CONFINED SPACE
35
LUBRICATING THE ROPE
36
SAFETY DATA SHEET
37
SCREW PINS SHOULD BE BACKED OFF TWO TURNS
38
TO CLEAN THE CYLINDER VALVE OF FOREIGN MATERIAL
39
BULL PIN
40
VERTICLE ALIGNMENT POSITIONER
41
FROM THE BASE METAL THICKNESS AND FUEL TYPE BEING USED
42
HORIZONTAL BRIDGING A.VERTICAL CHORDS
43
IS STILL TURNING
44
20'
45
A BLOCK OF STEEL USED AS COUNTERWEIGHT
46
LUBRICANT
47
IN ALL POSITIONS
48
1’IN
49
30 MINUTES
50
ANTI TWO BLOCKING DEVICE
51
15 PSI
52
COPING
53
D:D RATIO
54
EXCESSIVE LUBRICATION
55
AN EXTENSION OF THE MAIN BOOM
56
THE COMPANY SAFETY DEPARTMENT
57
CELLULAR DECK
58
A307
59
GOOD HOUSEKEEPING
60
LATERAL ENDS
61
LATERAL ENDS
62
VERTICLE ALIGNMENT POSITIONER
63
CRAWLER CRANES
64
THREAD CHASER
65
WIND
66
CENTER OF GRAVITY
67
NIPPLE ON THE BOTTOM OF THE STUD
68
OXY-ACETYLENE WELDING
69
LASER LIGHT
70
GTAW
71
PROPERLY TESTED AND STAMPED
72
TWISTING OF THE BUNDLE
73
PASS A WELDING PERFORMANCE TEST
74
HIGH STRENGTH BOLT
75
THE NUMBER OF THE SUPERVISORS
76
BASKET
77
THE MANUFACTURER’S INSTRUCTION
78
GROUND FAUIT CIRCUIT INTERRUMPTER
79
TENSION/CONTROL BOLT
80
IN THE FEILD
81
10%
82
45
83
85 DEGREE LINE
84
RESISTANT TO TURNING
85
ALL THE PLUG
86
EVERYONE