    What is the purpose of collective order?

    To manage production for an entire finshed produt on multiple levels

  • 2

    You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can You Parameterize this strategy profile?

    Specify a negative offset time.

  • 3

    Your production planners must execute planning only for specific resources. How can you achieve thisin Advaced Planning [PP/DS]?

    Use a resourece group.

  • 4

    Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

    You can use trigger points th qutomaticlly cteate rework orders via confirmations., You can use mass processing to set production orders to technically complet.

  • 5

    How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question.

    Use purchase orders for external procurement., Use stock transfer reservation for stock transfer., Use run schedule quantities for in-house production

  • 6

    You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must your do? Note: There are 2 correct answers to this question.

    Add the agreeent to the sourece list and mark it for MRP relevance., Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

  • 7

    How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

    increase the capacity supply in a time-ph ased interval., Form optimum sequences to reduce setup times., Determine a time period with available on the plannin board.

  • 8

    What will happen in the MRP run if you have created a new MRP-relevnt material that supports both in-house production and external procurement?

    The MRP run assumes external procurement.

  • 9

    Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question

    In the routing, In the bill of material (BOM) , In the production version

  • 10

    What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.

    Reduced delivery times, Reduced production times

  • 11

    What can you use heuristics in Advanced Planning (PP/PS) for?

    To solve planning problems for defined objects

  • 12

    For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

    The assigned routing must NOT have alternative sequences., The assigned routing and bill of material (BOM) must he valid in the entire validity period., The deletion flag must NOT be set for the bill of material (BOM) or the routing.

  • 13

    Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.

    Wait time, Move time, Queue time

  • 14

    You want to insert an operation at a certain time on a work center in the graphical planning table. The manning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

    The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

  • 15

    What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

    To determine the work in progress along the production line, To provide timely updates of inventory management for the staged components

  • 16

    In your plant, MRP is activated. Which options do you have to exclude a material from the MEW run? Note: There are 2 correct answers to this question.

    Use a specific material status., Use a specific MRP type.

  • 17

    What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

    Past sales order quantities, Market intelligence, One-off events

  • 18

    What is a work center hierarchy in capacity planning?

    A group of alternative work centers providing a cumulative available capacity for production

  • 19

    Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

    Forecast key figures, Safety stock

  • 20

    Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

    Create an object selection variant for production-planning-related alerts., Assign the alert profile to the overall profile.

  • 21

    Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

    Work center, Material

  • 22

    What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

    The Finite Scheduling indicator is NOT set in the strategy profile., The work center has several individual capacities.

  • 23

    When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly)?

    When you create a sales order

  • 24

    Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

    Posting of goods receipt for the product, Reduction of associated capacity requirements, Posting of production costs to the production cost collector

  • 25

    In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

    MRP creates the capacity requirements without checking the work center capacities.

  • 26

    You want to use capacity availability checks for production orders. Which settings have to be made for this? Note: There are 2 correct answers to this question.

    An overall profile must be assigned in the checking control., The Relevant for Finite Scheduling indicator must be set.

  • 27

    Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics?

    Batch management

  • 28

    Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.

    Supply Chain Management (SCM), Integrated Business Planning (IBP)

  • 29

    Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

    Run MRP with quota arrangement., Run PP/DS heuristics for repetitive manufacturing.

  • 30

    If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

    Fill up based on the lot size procedure.