Question
The science of gathering information about the physical Earth.
Question
Includes measurement of distances, determining relative positions of points on or beneath the surface of the earth, or establishing such points.
Question
Types of Surveys:
Question
Relates to laws of land ownership.
Question
It includes establishment or re-establishment of real property boundaries.
Question
Often called "stake-out", "layout" or "setting out".
Question
It is an essential part of construction that is performed to establish reference points and markers that will guide the construction.
Question
It includes mapping bodies of water such as lakes, rivers, etc.
Question
It includes measurement of features such as discharge, etc.
Question
A sub-discipline of surveying which requires high accuracy and precision.
CE215
Score
0 / 10
Correct rate
0%
Correct: 0
Incorrect: 0
Unanswered: 10
Question list
1
The science of gathering information about the physical Earth.Surveying
2
Includes measurement of distances, determining relative positions of points on or beneath the surface of the earth, or establishing such points.Surveying
3
Types of Surveys:Cadastral, Construction, Hydrographic, Industrial, Mine, Photogrammetric, Route, Topographic
4
Relates to laws of land ownership.Cadastral Surveys
5
It includes establishment or re-establishment of real property boundaries.Cadastral Surveys
6
Often called "stake-out", "layout" or "setting out".Construction Surveys
7
It is an essential part of construction that is performed to establish reference points and markers that will guide the construction.Construction Surveys
8
It includes mapping bodies of water such as lakes, rivers, etc.Hydrographic Surveys
9
It includes measurement of features such as discharge, etc.Hydrographic Surveys
10
A sub-discipline of surveying which requires high accuracy and precision.Industrial Surveys
11
It includes alignment of machineries and optical tooling.Industrial Surveys
12
The practice of measuring and mapping on-ground or underground points for the purpose of exploiting and utilizing mineral deposits.Mine Surveys
13
Obtains reliable spatial information from photographic images (may it be aerial or terrestrial).Photogrammetric Surveys
14
Provides the data needed to determine horizontal and vertical alignment, and even earthwork quantities, for the design of linear structures such as roads, railways, pipelines, etc.Route Surveys
15
Are used to map natural and/or man-made features on the ground as well as obtain elevations.Topographic Surveys
16
Consists of counting the number of steps or paces in a required distance.Pacing
17
Defined as the length of a step in walking.Pace
18
A double step.Stride
19
The distance covered by one pace.Pace Factor
20
Determined by dividing the known distance by the average number of paces required to traverse it.Pace Factor
21
The difference between the observed value and the true value of a measurement.Error
22
Are caused by variations in wind, temperature, humidity, atmospheric pressure, atmospheric refraction, gravity, and magnetic declination. An example is a steel tape whose length varies with changes in temperature.Natural Errors
23
Result from any imperfection in the construction or adjustment of instruments and from the movement of individual parts. For example, the graduations on a scale may not be perfectly spaced, or the scale maybe warped.Instrumental Errors
24
Arise principally from limitations of the human senses of sight and touch.Personal Errors
25
Types of Errors:Natural, Instrumental, Personal
26
Refers to the degree of refinement or consistency of a group of observations and is evaluated on the basis of discrepancy size.Precision
27
Denotes the absolute nearness of observed quantities to their true values.Accuracy
28
Are made in a variety of lengths, materials, and weights.Measuring Tapes
29
The process of directly measuring distances with the use of a graduated tape.Taping
30
The person responsible for the accuracy and speed of all linear measurements with the tape.Headtapeman
31
He determines and directs the marking of points or stations, orders the clearing out of obstructions along lines to be measured, and is the person who carries the zero end of the tape ahead.Headtapeman
32
He keeps a record of all measurements, sketches, and observations taken during the process of measurement.Recorder
33
He checks by pacing all measurements made by the tapemen for possible errors, mistakes, and blunders.Recorder
34
The person whose duty is to hold the range pole (or flagpole) at selected points.Flagman
35
He helps the tapemen in making measurements and assists in clearing out obstructions along the line to be measured.Flagman
36
The person whose duty is to assist the head tapeman during a taping operation.Reartapeman
37
He is the one who holds the 30-meter end or any intermediate meter mark of the tape during a measurement.Reartapeman
38
Are calibrated at controlled conditions.Measuring Tape
39
They need to consider environmental factors when measuring distances using these instruments.Surveyors
40
Is another procedure of obtaining horizontal distances.Tachymetry
41
Is based on the optical geometry of the instruments employed and is an indirect method of measurement.Tachymetry
42
Is used to determine subtended intervals and angles on a graduated rod or scale from which distances are computed by trigonometry.Transit
43
Defined as the horizontal angle the line makes with an established line of reference.Direction of a Line
44
Kinds of angles which can be used to describe the direction of lines:Interior Angles, Deflection Angles, Angles to the Right, Bearings, Azimuth
45
Are angles between adjacent lines in a closed polygon.Interior Angles
46
Are located outside a closed polygon and are referred to as explements of interior angles.Exterior Angles
47
Are angles between a line and the prolongation of the preceding line.Deflection Angles
48
Are measured clockwise from the preceding line to the succeeding line.Angles to the Right
49
The direction of a line may be described by giving its __.Bearing
50
The acute horizontal angle between the reference meridian and the line.Bearing of a Line
51
Measured clockwise from the north.Whole-Circle Bearing
52
The actual angle between the reference meridian (either north or south) and the line.Reduced Bearing
53
Are horizontal angles observed clockwise from any reference meridian.Azimuths
54
In plane surveying, they are generally observed from the north, but astronomers and the military have used the south as the reference direction.Azimuths
55
They used the south as its reference for azimuths for __, but the north has been adopted for __.National Geodetic Survey (NGS), NAD27, NAD83
56
For long sights and accurate levelling work, the __ of the earth and __ of the line of sight shall have to be taken into consideration.Effects of Curvature and Refraction
57
General term applied to any of the various processes by which elevations of points or differences in elevation are determined.Levelling
58
Method for checking and recalibrating a level or transit.Two-Peg Test
59
This method is either for an optical or digital level, or a transit being used as a level.Two-Peg Test
60
If this error is corrected with a transit, it also improves the accuracy of its vertical angle readings.Two-Peg Test