Question
Limit physical access to finished goods, raw materials, and production processes
Question
Work orders, cost sheets, move tickets, job tickets, materials requisitions, work in- process records, finished goods inventory file
Question
Cost accounting function reconciles all costs of production; GL reconciles overall system
Question
Supervisor oversee usage of raw materials and timekeeping
Question
Inventory control separate from raw materials and finished goods inventory custody; Cost accounting separate from work centers; GL separate from other accounting functions
Question
Work orders, move tickets, and material requisitions
Question
Security over distribution of production documents and management reports
Question
Edit controls to detect clerical errors in input data;
Question
Check digit for validating account numbers
Question
Error messages to signify account mismatch
AIS Finals
Score
0 / 10
Correct rate
0%
Correct: 0
Incorrect: 0
Unanswered: 10
Question list
1
Limit physical access to finished goods, raw materials, and production processesaccess control
2
Work orders, cost sheets, move tickets, job tickets, materials requisitions, work in- process records, finished goods inventory fileaccounting records
3
Cost accounting function reconciles all costs of production; GL reconciles overall systemindependent verification
4
Supervisor oversee usage of raw materials and timekeepingsupervision
5
Inventory control separate from raw materials and finished goods inventory custody; Cost accounting separate from work centers; GL separate from other accounting functionssegregation of duties
6
Work orders, move tickets, and material requisitionstransaction authorization
7
Security over distribution of production documents and management reportsoutput controls
8
Edit controls to detect clerical errors in input data;input controls
9
Check digit for validating account numbersinput controls
10
Error messages to signify account mismatchprocessing controls
11
Password control to prevent unauthorized access to the systemprocessing controls
12
Back up procedures to protect digital files; Multilevel security (roles) to limit access to data files and program modulesprocessing controls
13
automated posting to subsidiary and GL accountsprocessing controls
14
transforms input resources such as raw materials, labor and overhead into finished products or services for sale.conversion cycle
15
creates a homogeneous products through a continuous series of standard proceduresContinuous processing
16
fabrication of discrete products in accordance with customer specificationsMake-to-order processing
17
produces discrete groups(batches) of products.batch processing
18
formal plan and authorization to begin production. This document describes the specific products to be made, the quantities to be produced in each batch, and the manufacturing timetable for starting and completing productionproduction schedule
19
this specifies the types and quantities of the raw materials and subassemblies used in producing a single unit of finished product. The raw material requirements for an entire batch are determined by multiplying the bill of materials by the number of items in the batch.bill of materials
20
shows the production path that a particular batch of product follows manufacturing. duringroute sheet
21
draws from bill of materials route and sheets to specify the materials and production for each batch.work order
22
records work done in each work center and authorizes the movement of the job or batch from one work to anothermove ticket (job ticket)
23
authorizes the storekeeper to release materials to individuals or work centers in the production processmaterials requisition
24
This includes examining the production planning and control function which consists of specifying materials and operation requirements and production scheduling.production planning and control
25
raw basta materials requirement for a batch of any given product is the difference between what is needed and what is available in the raw materials inventory.materials and operations requirements
26
The master schedule for production run coordinates the production of many different batches.production scheduling
27
The actual production operations begin when workers obtain raw materials from storekeeping in exchange for materials requisitions.work centers and storekeeping
28
To evidence that a stage of production has been completed, a copy of the move ticket is sent back to production planning and control to update the open work order file.work centers and storekeeping